Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » ACME Solar Appoints Auneesh Chandra Shukla as General Manager – Construction Head (ISTS-BESS)
Battery Manufacturing (BESS)

ACME Solar Appoints Auneesh Chandra Shukla as General Manager – Construction Head (ISTS-BESS)

Sanjana NegiBy Sanjana NegiJune 22, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Auneesh Chandra Shukla

ACME Solar has appointed Auneesh Chandra Shukla as General Manager – Construction Head (ISTS-BESS), reinforcing its leadership team as the company accelerates the development of large-scale renewable energy and battery energy storage system (BESS) projects across India.

With over two decades of experience in renewable energy, project development, and infrastructure execution, Auneesh brings extensive expertise in delivering utility-scale solar, hybrid, and grid-connected renewable energy projects. In his new role, he will lead the construction and execution of ACME Solar’s Inter-State Transmission System (ISTS)-connected Battery Energy Storage System (BESS) projects, supporting the company’s expanding clean energy portfolio.

Throughout his career, Auneesh has overseen the development, construction, commissioning, and operational management of large renewable energy assets. His experience spans construction management, project execution, contract administration, stakeholder engagement, resource planning, regulatory compliance, commissioning, and operational excellence.

Before joining ACME Solar, he held key leadership positions at Aditya Birla Renewables Limited, Juniper Green Energy, UPC Renewables India, PLS Green Power Private Limited, Vikram Solar, Harsha Abakus Solar Division of Harsha Engineers International Limited, Sukhbir Agro Energy Ltd. (SAEL), Moser Baer India Ltd., and Ashish Electrical Works.

During his career, Auneesh has played a pivotal role in delivering several landmark renewable energy projects across India, including utility-scale solar power plants, hybrid renewable energy projects, transmission infrastructure, and grid-connected clean energy installations. He has successfully managed projects ranging from rooftop solar systems to multi-hundred-megawatt renewable energy facilities, demonstrating strong technical expertise and leadership in complex infrastructure development.

His appointment comes as battery energy storage systems gain increasing importance in India’s renewable energy transition, enabling greater integration of solar and wind power while enhancing grid stability and reliability. With his extensive project execution experience, Auneesh is expected to play a key role in advancing ACME Solar’s energy storage initiatives and supporting the company’s long-term growth strategy in utility-scale renewable energy and energy storage infrastructure.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS clean energy portfolio India News PLS Green Power Private Limited renewable energy projects
Sanjana Negi
  • Website

News contributor at The Battery Magazine. I write on the latest developments in battery technology, energy storage solutions, and power innovations. Committed to delivering accurate and timely updates from the world of batteries.

Keep Reading

Ciju K Raj

SWELECT Energy Appoints Ciju K Raj as Assistant Vice President – Channels

Hexa Climate

Hexa Climate Signs 160 MW FDRE Power Purchase Agreement with NHPC

Tata Motors

Tata Motors Secures Over 3,400 Orders for Electric Commercial Vehicles Across India

Leave A Reply Cancel Reply

15 − 8 =

Renewable energy
Auneesh Chandra Shukla

ACME Solar Appoints Auneesh Chandra Shukla as General Manager – Construction Head (ISTS-BESS)

June 22, 2026
Ciju K Raj

SWELECT Energy Appoints Ciju K Raj as Assistant Vice President – Channels

June 22, 2026
Hexa Climate

Hexa Climate Signs 160 MW FDRE Power Purchase Agreement with NHPC

June 22, 2026
Avaada Unveils ‘Solar in Full Bloom’ Public Art Installation in Mumbai

Avaada Unveils ‘Solar in Full Bloom’ Public Art Installation in Mumbai

June 22, 2026
Batteries
Solis

Solis to Showcase Advanced Energy Storage Solutions at Intersolar Europe 2026

June 22, 2026
NTPC REL Invites Bids for 240 MW/960 MWh Battery Energy Storage Project at Devikot Solar Plant, Rajasthan

NTPC REL Invites Bids for 240 MW/960 MWh Battery Energy Storage Project at Devikot Solar Plant, Rajasthan

June 19, 2026
QuantumScape Announces Agreement with Honda on Solid-State Battery Technology

QuantumScape Announces Agreement with Honda on Solid-State Battery Technology

June 19, 2026
India’s C&I Energy Storage Market Set to Reach 31 GWh by 2032: IESA Report

India’s C&I Energy Storage Market Set to Reach 31 GWh by 2032: IESA Report

June 19, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.