Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » ChemVolt Global to Set Up 5 GWh Lithium-Ion Gigafactory in Andhra Pradesh
Batteries

ChemVolt Global to Set Up 5 GWh Lithium-Ion Gigafactory in Andhra Pradesh

ManshiBy ManshiJanuary 21, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
ChemVolt Global to Set Up 5 GWh Lithium-Ion Gigafactory in Andhra Pradesh

ChemVolt Global has signed a memorandum of understanding (MoU) with the Government of Andhra Pradesh to establish a 5 GWh lithium-ion cell manufacturing gigafactory in the state, with a planned investment of INR 2,500 crore. The facility aims to support domestic demand for grid-scale battery energy storage systems (BESS), clean mobility solutions, and commercial & industrial (C&I) energy storage applications.

The gigafactory is expected to foster a local ecosystem of suppliers and service providers around advanced battery manufacturing, bolstering India’s domestic battery production capabilities.

Job Creation and Economic Impact

The project is anticipated to generate approximately 1,500 direct jobs across manufacturing, engineering, operations, and quality functions. In addition, more than 4,000 indirect jobs are expected to be created through component suppliers, equipment manufacturers, logistics providers, and ancillary industries, contributing significantly to regional economic growth.

Phased Implementation and Production Plans

The gigafactory will be developed in two phases. Phase I will establish a 1 GWh advanced cell production line by Q3 2027. Phase II will add 4 GWh, reaching a total capacity of 5 GWh by Q2 2029. The plant will produce 314 Ah and 750 Ah prismatic lithium-ion cells designed for grid-scale storage, heavy electric vehicles, and C&I applications, catering to both domestic and international markets.

“The Andhra Pradesh gigafactory is envisioned as a national-scale manufacturing initiative driving high-value job creation, strengthening domestic battery supply chains, and positioning India as a global hub for advanced lithium-ion cell production,” said Kuldeep Gupta, Founder and CEO of ChemVolt Global.

Expansion of Energy Storage Portfolio

Alongside the gigafactory announcement, ChemVolt Global unveiled the expansion of its Energy Storage System (ESS) portfolio. The Starlight Series includes a 5.016 MWh DC block in a 20-ft container with liquid cooling and a 9.16 MWh AC block in a 40-ft container with four-hour duration and liquid cooling. The Titan Series offers Titan 1 (1.6 MWh AC block) and Titan 2 (2.5 MWh DC block) in 12-ft cabinets, designed for commercial and industrial applications.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage systems clean mobility electric vehicles energy storage system India News lithium-ion cell
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Comments are closed.

Renewable energy
GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

July 21, 2026
India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

July 21, 2026
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Wärtsilä Reports Half-year Financial Results

Wärtsilä Reports Half-year Financial Results

July 21, 2026
Batteries
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026
Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

Graphite One Advances US Battery Supply Chain With Ohio Anode Material Plant

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.