Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Fiji Signs MoU for Solar PV and Battery Energy Storage Development in Yaqara
Renewable energy

Fiji Signs MoU for Solar PV and Battery Energy Storage Development in Yaqara

Shivangi GuptaBy Shivangi GuptaSeptember 8, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Fiji Signs MoU with EPC Solar

Energy Fiji Limited (EFL) has entered into a Memorandum of Understanding (MoU) with Australian firm EPC Solar and its project partners to develop a grid-connected solar photovoltaic (PV) and battery energy storage system in Yaqara, Fiji. The proposed project marks a significant step toward expanding Fiji’s renewable energy capacity while strengthening the country’s power infrastructure and grid resilience.
The partnership supports EFL’s target of increasing the share of renewable energy in Fiji’s electricity generation from around 49 percent currently to 60 percent by 2029 and 90 percent by 2035.
EFL Chief Executive Officer Fatiaki Gibson said the agreement moves the company’s renewable energy ambitions from planning toward project implementation. He stressed that Fiji’s clean energy targets need to translate into operating projects that are connected to the national electricity grid and deliver tangible benefits to consumers.
However, several key steps must be completed before the Yaqara project can begin construction and operations. EFL and its partners will undertake detailed due diligence, validate the proposed tariff, obtain the necessary regulatory approvals and negotiate a commercially viable Power Purchase Agreement (PPA).
Under the current framework, the parties aim to finalize the PPA by the first quarter of 2027, subject to successful completion of due diligence, tariff validation and regulatory clearances. The project is targeted to achieve commercial operation by early 2029.
The Yaqara solar and battery facility is expected to contribute to EFL’s broader plan to integrate 165 megawatts (MW) of solar power and battery storage into Fiji’s national grid by 2029. The project will also require supporting transmission infrastructure to be developed alongside the generation facility to ensure reliable grid integration.
EPC Solar is collaborating with international partners, including Zero-E Services Australia Pty Ltd, to oversee the project’s engineering, financing, development and delivery. A dedicated private project company is expected to manage the financing, construction, ownership, operation and maintenance of the solar and battery storage facilities.

The partnership aims to attract private investment and international technical expertise to Fiji’s renewable energy sector, while contributing to grid modernization, improving energy security and supporting the country’s transition toward a cleaner and more sustainable energy system.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery storage Energy Fiji Limited EPC Solar global news Grid MoU solar photovoltaic
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

Bondada Group Enters EV Market, Previews T1 Electric Two-Wheeler and Opens Pre-Bookings

CATL Introduces Dual-Electric Range-Extender Battery to Boost Electric Heavy-Duty Truck Adoption

CATL Introduces Dual-Electric Range-Extender Battery to Boost Electric Heavy-Duty Truck Adoption

Leave A Reply Cancel Reply

thirteen − thirteen =

Renewable energy
Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

Lebanon Plans 800 MW Solar and 440 MW Wind Projects to Improve Electricity Supply

October 21, 2026
Servotech Renewable Power Systems Appoints Shivinder Singh Buttar as VP and Head of HR

Servotech Renewable Power Systems Appoints Shivinder Singh Buttar as VP and Head of HR

October 21, 2026
Waaree Renewable Technologies Reports Strong Revenue Growth Despite Quarterly Profit Decline

Waaree Renewable Technologies Reports Strong Revenue Growth Despite Quarterly Profit Decline

October 21, 2026
NeoTerra Launches Solar-Powered Smart ACs With Up to 80% Energy Savings

NeoTerra Launches Solar-Powered Smart ACs With Up to 80% Energy Savings

October 21, 2026
Batteries
CATL Introduces Dual-Electric Range-Extender Battery to Boost Electric Heavy-Duty Truck Adoption

CATL Introduces Dual-Electric Range-Extender Battery to Boost Electric Heavy-Duty Truck Adoption

October 21, 2026
Rondo Energy and Rio Tinto Begin Engineering for 360 MWh Heat Battery Project

Rondo Energy and Rio Tinto Begin Engineering for 360 MWh Heat Battery Project

October 21, 2026
Sahaj Solar Plans 1.8 GWh Battery Storage Manufacturing Facility in Gujarat

Sahaj Solar Plans 1.8 GWh Battery Storage Manufacturing Facility in Gujarat

October 21, 2026
Rivian and Redwood Materials Expand Partnership to Span the Lifecycle of the Battery

Rivian and Redwood Materials Expand Partnership to Span the Lifecycle of the Battery

October 19, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.