Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Grid » Power Generation (Thermal + Renewable integration) » JSW Energy to Acquire 300 MW Maruti Clean Coal & Power Limited
Power Generation (Thermal + Renewable integration)

JSW Energy to Acquire 300 MW Maruti Clean Coal & Power Limited

PrakashBy PrakashJune 15, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
JSW Energy to Acquire 300 MW Maruti Clean Coal & Power Limited

JSW Energy Limited has signed a definitive agreement with Kolahai Infotech Private Limited and SFI Parcel Services Private Limited to acquire 100% equity shares of Maruti Clean Coal & Power Limited (“MCCPL”). The transaction is subject to receipt of the necessary regulatory and customary approvals under the definitive agreements. Upon consummation of the transaction, MCCPL will become a wholly owned subsidiary of the Company.

MCCPL owns and operates a 300 MW thermal power plant at Korba, Chhattisgarh. The plant has a long-term Power Purchase Agreement (PPA) of 195 MW (net) with Rajasthan discoms, routed through PTC India, with a residual PPA life of ~14 years. In addition, the plant provides 5% power at variable cost to the Chhattisgarh discom, while the balance of ~64 MW capacity is sold in the merchant market. Coal is secured through a long-term Fuel Supply Agreement with SECL and linkage under the SHAKTI scheme.

The transaction values MCCPL at an Enterprise Value of approximately ₹1,410 crore, subject to customary closing adjustments as per the definitive agreements. The acquired asset’s estimated FY26 EBITDA stood at ~₹279 crore. This operating asset is EBITDA- and PAT-accretive while also reducing the Company’s net leverage and strengthening overall balance sheet resilience.

Beyond the immediate financial benefits, the asset offers potential upside through optimisation of logistics and O&M costs. Its proximity to JSW Energy’s Mahanadi thermal plant further unlocks operational synergies, strengthening the Company’s regional thermal footprint.

“This acquisition reflects our disciplined ‘Build vs. Buy’ approach, where we pursue calibrated value-accretive inorganic opportunities. MCCPL has an operating asset that is earnings accretive from day one, strengthening both our thermal portfolio and our cash flows. As we fortify our thermal generation capacity, we remain proud to play our part in powering India’s growth and supporting the nation’s energy security. This transaction is another step in building a balanced, resilient portfolio that delivers sustainable returns while meeting the country’s rising energy needs. ” Mr. Sharad Mahendra, Joint Managing Director and CEO of JSW Energy.

JSW Energy currently operates an installed thermal capacity of 5,658 MW, with a further 3,200 MW under construction at its Salboni Thermal Power Plant and a pipeline of 1,800 MW for brownfield expansion at Mahanadi. This operating asset acquisition further strengthens the Company’s installed thermal portfolio. Post closure, the Company’s total installed and locked-in thermal capacity will reach 5,958 MW and 10,958 MW, respectively.

JSW Energy has a current total locked-in generation capacity of 32.1 GW, comprising 13.9 GW operational and 13.6 GW under construction across thermal, hydro, and renewables, with a pipeline of 4.6 GW. The company also has 29.6 GWh of locked-in energy storage capacity, comprising pumped hydro storage of 26.4 GWh and battery energy storage systems of 3.2 GWh. The company aims to reach 30 GW of generation capacity and 40 GWh of energy storage capacity by 2030 and to achieve carbon neutrality by 2050.

For the transaction, Khaitan & Co acted as legal advisor, BDO India carried out financial and tax due diligence, and Roots Legal conducted land due diligence for JSW Energy.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
India News JSW Energy Kolahai Infotech Private Limited Maruti Clean Coal and Power Ltd SFI Parcel Services Private Limited
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Dilip Buildcon Named L1 Bidder for Rs 400 kV AIS Yavatmal Transmission Project

Dilip Buildcon Named L1 Bidder for Rs 400 kV AIS Yavatmal Transmission Project

GARC advances automotive testing under PM E-DRIVE

GARC advances automotive testing under PM E-DRIVE

Rajan Jha Promoted to Country Head – India & Southeast Asia

Rajan Jha Promoted to Country Head – India & Southeast Asia at Sunka Lead

Leave A Reply Cancel Reply

4 × 1 =

Renewable energy
NTPC Green Energy Commissions 81.34 MW Kalasar Solar Project in Rajasthan

NTPC Green Energy Commissions 81.34 MW Kalasar Solar Project in Rajasthan

September 28, 2026
Odisha Approves Nuclear Feasibility Studies by NTPC and Adani Power

Odisha Approves Nuclear Feasibility Studies by NTPC and Adani Power

September 28, 2026
IndiGrid to Acquire Luhri Power Transmission Project for Up to Rs 1,336 Crore

IndiGrid to Acquire Luhri Power Transmission Project for Up to Rs 1,336 Crore

September 28, 2026
BluPine Energy Signs Long-Term Renewable Energy PPA with Bharti Hexacom in Rajasthan

BluPine Energy Signs Long-Term Renewable Energy PPA with Bharti Hexacom in Rajasthan

September 28, 2026
Batteries
EnerVenue Opens First High-Volume Aqueous Metal Cell Line

EnerVenue Opens First High-Volume Aqueous Metal Cell Line

September 28, 2026
Rajan Jha Promoted to Country Head – India & Southeast Asia

Rajan Jha Promoted to Country Head – India & Southeast Asia at Sunka Lead

September 28, 2026
Globeleq Appoints Edouard Wenseleers as Chief Development Officer

Globeleq Appoints Edouard Wenseleers as Chief Development Officer

September 28, 2026
Hoymiles Launches HoyUltra 2000M C&I Energy Storage System in Budapest

Hoymiles Launches HoyUltra 2000M C&I Energy Storage System in Budapest

September 28, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.