Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » Waaree Transpower Secures ₹160 Crore Order for BESS Medium-Voltage Skids
Battery Manufacturing (BESS)

Waaree Transpower Secures ₹160 Crore Order for BESS Medium-Voltage Skids

Shivangi GuptaBy Shivangi GuptaAugust 13, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Waaree Transpower Secures 160 Crore Order for BESS Medium-Voltage Skids

Waaree Transpower, a subsidiary of Waaree Energies, has secured an order worth around ₹160 crore from an energy storage technology and solutions provider for the supply of 8.3 MVA medium-voltage (MV) skids for Battery Energy Storage System (BESS) applications. The order is expected to strengthen Waaree Transpower’s presence in the electrical infrastructure segment, amid the growing demand for energy storage solutions.

The purchase includes plug-and-play, IEC-compliant MV skid solutions made especially for BESS applications. The equipment may be transported and installed as a packed unit between project locations because it is integrated into a 20-foot container. Additionally, its shippable and stackable design is meant to give large-scale energy storage deployments more flexibility.

Shipments under the order have already commenced from July 2026, giving the contract an immediate execution component. The development also marks a significant step in Waaree Transpower’s efforts to expand its business beyond conventional transformer manufacturing and participate more directly in the electrical infrastructure requirements of the energy transition.

MV skids play a critical role in BESS installations by integrating key medium-voltage electrical equipment into a compact, factory-assembled package. Such systems can simplify project deployment while supporting the connection of battery-storage assets with wider electrical networks.

The timing of the order is significant as BESS is becoming increasingly important to India’s power system. Rapid growth in solar and wind generation is creating a greater need for flexible resources that can store electricity when renewable generation is high and discharge it when demand rises or renewable output falls.

Additionally, energy storage can help manage the intermittent nature of renewable energy sources, better use transmission and distribution infrastructure, and handle grid-balancing requirements. Demand is accordingly shifting from generation equipment alone to the larger ecosystem of transformers, switchgear, power-conversion systems, and grid-interconnection infrastructure as renewable capacity grows.

As a result, the ₹160 crore order is both a significant addition to Waaree Transpower has business pipeline and a calculated move further into the BESS electrical infrastructure ecosystem, where demand is anticipated to increase in tandem with India’s shift to a more adaptable and renewable power system.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage Battery Energy Storage System battery storage BESS clean energy transition energy storage Energy Storage Solutions India News renewable energy Waaree Energies
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Odisha Amends Renewable Energy Policy, Boosts Wind and BESS

Odisha Cabinet Approves Key OREP 2022 Amendments; Extends RE Incentives, Removes Wind Cap and Pushes BESS

Maharashtra Invites Bids for 170 MW Floating Solar Project with BESS

Maharashtra Invites Bids for 170 MW Floating Solar Project with BESS

POWERGRID Appoints Amol Taori as Director (Finance) After Nearly Three Decades at HPCL

POWERGRID Appoints Amol Taori as Director (Finance) After Nearly Three Decades at HPCL

Leave A Reply Cancel Reply

fifteen + three =

Renewable energy
Odisha Amends Renewable Energy Policy, Boosts Wind and BESS

Odisha Cabinet Approves Key OREP 2022 Amendments; Extends RE Incentives, Removes Wind Cap and Pushes BESS

August 13, 2026
Maharashtra Invites Bids for 170 MW Floating Solar Project with BESS

Maharashtra Invites Bids for 170 MW Floating Solar Project with BESS

August 13, 2026
Juniper Green Energy Appoints Jagdeep Singh as AGM to Strengthen Project Management and Renewable Energy Operations

Juniper Green Energy Appoints Jagdeep Singh as AGM to Strengthen Project Management and Renewable Energy Operations

August 13, 2026
JSW Energy, Druk Green Power Sign Pact for 920 MW Hydropower Project in Bhutan

JSW Energy, Druk Green Power Sign Pact for 920 MW Hydropower Project in Bhutan

August 13, 2026
Batteries
Waaree Transpower Secures 160 Crore Order for BESS Medium-Voltage Skids

Waaree Transpower Secures ₹160 Crore Order for BESS Medium-Voltage Skids

August 13, 2026
Wärtsilä Named Among Top 10 Global BESS Integrators

Wärtsilä Named Among Top 10 Global BESS Integrators

August 12, 2026
India Outlines Power Framework Balancing Affordability, Grid Stability and Renewables

India Outlines Power Framework Balancing Affordability, Grid Stability and Renewables

August 12, 2026
Ola Electric Gets Five-Year PLI Window, Eyes Rupees 7,240 Cr Incentive

Ola Electric Gets Five-Year PLI Window for 20 GWh Cell Allocation

August 12, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.