Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » KSEBL Approves ₹26,478 Crore FY27 Capex to Boost Renewables and Electric Vehicle Infrastructure
Renewable energy

KSEBL Approves ₹26,478 Crore FY27 Capex to Boost Renewables and Electric Vehicle Infrastructure

ManshiBy ManshiJanuary 2, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
KSEBL Approves ₹26,478 Crore FY27 Capex to Boost Renewables and Electric Vehicle Infrastructure

The Kerala State Electricity Board Limited (KSEBL) has approved a comprehensive capital expenditure plan of ₹26,478 crore for the financial year 2026–27, marking a significant step towards strengthening the state’s power infrastructure and accelerating its clean energy transition. The approved outlay represents an increase over the revised capital plan of ₹24,790 crore for 2025–26 and spans investments across generation, transmission, distribution, IT systems, energy storage, smart metering, and electric vehicle (EV) charging infrastructure.

The investment plan aligns with Kerala’s long-term energy transition objectives and regulatory requirements under the Kerala State Electricity Regulatory Commission’s Renewable Energy and Related Matters Regulations, 2025.

Focus on Grid Modernisation and Transmission

Transmission infrastructure has been allocated ₹21,175 crore for FY 2026–27, reflecting KSEBL’s priority on grid strengthening and reliability. A major portion of this allocation supports the ongoing TransGrid 2.0 programme, which aims to modernise and expand the intra-state transmission network to accommodate rising renewable energy penetration. Conventional transmission works, system operation projects, and Power System Development Fund initiatives are also included to improve grid stability.

Distribution and Consumer-Facing Infrastructure

The distribution segment has been allotted ₹21,669 crore, with the Dyuthi scheme accounting for the largest share. These investments are intended to improve last-mile connectivity, reduce outages, and enhance service quality. The plan also includes significant funding for smart metering, reflecting KSEBL’s push toward advanced metering infrastructure and improved energy management.

Generation and Renewable Energy Integration

For the generation segment, ₹2,849 crore has been earmarked. Hydropower projects continue to form the backbone of generation investments, covering ongoing and new hydel initiatives such as Mankulam, Thottiyar, Pazhassi Sagar, Upper Sengulam, and Chinnar. Allocations also cover renovation and modernisation of existing hydel stations, limited thermal generation works, and renewable energy projects including solar, wind, PM-KUSUM, and SOURA programmes.

Additional funds have been set aside for dam safety, desiltation, environmental studies, and other generation-related works.

Energy Storage, EV Charging, and Digital Systems

KSEBL has allocated dedicated funding for Battery Energy Storage Systems (BESS) and preparatory work for pumped storage projects, underlining the role of storage in balancing renewable energy integration. EV charging infrastructure is another key focus area, with substantial investment planned to support the growing adoption of electric mobility in the state.

IT systems and digital infrastructure form one of the largest components of the capital plan. Significant funding has been approved under the Revamped Distribution Sector Scheme (RDSS) for smart meters, SCADA systems, IT/OT projects, and digital grid management, aimed at improving operational efficiency and transparency.

Alignment with Renewable and Storage Obligations

These investments are critical for meeting Kerala’s Renewable Purchase Obligation (RPO) and Energy Storage Obligation (ESO) targets. For FY 2026–27, the minimum RPO is set at 46% of total consumption, while the ESO stands at 1.5%, with the majority of stored energy required to come from renewable sources.

Revised FY 2025–26 Plan

Alongside the new approvals, the board also cleared a revised capital outlay of ₹24,790 crore for FY 2025–26, scaled down from earlier estimates due to project deferments and slower execution of certain initiatives.

Overall, KSEBL’s approved capital expenditure plan reflects a strong commitment to building a resilient, modern, and sustainable power system, supporting renewable energy integration, grid modernisation, and Kerala’s transition to a greener energy future.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS electric mobility electric vehicle energy storage Greener Energy India News KSEBL pumped storage projects renewable energy
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

RECPDCL Transfers Mekhali Power Transmission

RECPDCL Transfers Mekhali Power Transmission SPV to Dilip Buildcon

NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

Comments are closed.

Renewable energy
PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

June 4, 2026
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.