Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » LONGi to Supply 176 MW DC Hi-MO 9 Solar Modules for Australia’s Muswellbrook Project
Battery Manufacturing (BESS)

LONGi to Supply 176 MW DC Hi-MO 9 Solar Modules for Australia’s Muswellbrook Project

Shivangi GuptaBy Shivangi GuptaNovember 16, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
LONGi to Supply 176 MW DC Hi-MO 9 Solar Modules for Australia's Muswellbrook Project

LONGi has signed an agreement to supply 176 MW DC of its high-efficiency Hi-MO 9 solar modules for the Muswellbrook Solar Farm and Battery Energy Storage System (BESS) project in New South Wales, Australia, strengthening its presence in the country’s utility-scale solar market.

The project, developed by international renewable energy developer OX2, will have a solar capacity of 135 MW AC. Photovoltaic engineering, procurement and construction (EPC) delivery is being undertaken by a joint venture between Bouygues Construction Australia and Equans Solar & Storage.

Construction commenced in May 2026, with commissioning and grid connection expected in 2028.

Solar Farm to Repurpose Former Coal Mine

The Muswellbrook Solar Farm and BESS project is being developed across 482 hectares of rehabilitated former coal mine land in the Upper Hunter region of New South Wales.

The project will feature approximately 300,000 LONGi photovoltaic modules and is expected to generate around 347 GWh of electricity annually, equivalent to the consumption of approximately 52,000 Australian households.

The project is also expected to avoid approximately 300,000 tonnes of carbon dioxide equivalent emissions annually. During peak construction, it is anticipated to create up to 200 jobs in the Hunter region.

LONGi Hi-MO 9 Modules to Deliver High Energy Yield

The project will use LONGi’s bifacial Hi-MO 9 modules, based on the company’s proprietary HPBC 2.0 (Hybrid Passivated Back Contact) cell technology and Tairay silicon wafers.

The Hi-MO 9 series offers module efficiency of up to 24.8% and features a zero-busbar front-side design. The modules are designed to deliver improved low-light performance during dawn, dusk and cloudy conditions.

LONGi said the modules also offer lower degradation, with a 30-year power warranty and an annual linear degradation rate 0.05 percentage points lower than standard N-type products. This translates into a 1.5% higher power output after 30 years, according to the company.

The modules feature a temperature coefficient of -0.26%/°C, supporting performance under high-temperature conditions.

Leon Zhang, President of Utility Europe at LONGi, said the project demonstrates confidence in the company’s back-contact technology and its ability to deliver energy yield and long-term value in challenging environments.

Solar and Storage Integration in Australia

Australia continues to expand utility-scale renewable energy and battery storage projects as the country transitions away from coal-fired generation.

Hybrid solar and storage developments such as Muswellbrook are expected to support grid stability, manage peak electricity demand and contribute to replacing retiring coal capacity across the National Electricity Market.

The project also highlights the potential of rehabilitated mining sites to support new clean energy infrastructure.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Australia battery energy storage global news Hi-MO 9 LONGi solar modules
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Power Ministry Showcases BESS, Vanadium Flow Batteries at India International Trade Fair 2026

Power Ministry Showcases BESS, Vanadium Flow Batteries at India International Trade Fair 2026

HD Hyundai Showcases 24.4% Efficient Solar Modules, BESS Solutions at RE+ 2026

HD Hyundai Showcases 24.4% Efficient Solar Modules, BESS Solutions at RE+ 2026

Waaree ESS Starts Commercial Production at 5.15 GWh Battery Pack Line in Gujarat

Leave A Reply Cancel Reply

four × 1 =

Renewable energy
LONGi to Supply 176 MW DC Hi-MO 9 Solar Modules for Australia's Muswellbrook Project

LONGi to Supply 176 MW DC Hi-MO 9 Solar Modules for Australia’s Muswellbrook Project

November 16, 2026
HD Hyundai Showcases 24.4% Efficient Solar Modules, BESS Solutions at RE+ 2026

HD Hyundai Showcases 24.4% Efficient Solar Modules, BESS Solutions at RE+ 2026

November 16, 2026
Rajasthan Mandates Land-Use Conversion Approval for Renewable Energy Projects

Rajasthan Mandates Land-Use Conversion Approval for Renewable Energy Projects

November 16, 2026
India’s Renewable Energy Capacity Reaches 308 GW, Accounts for 55% of Installed Power

India’s Renewable Energy Capacity Reaches 308 GW, Accounts for 55% of Installed Power

November 16, 2026
Batteries
Power Ministry Showcases BESS, Vanadium Flow Batteries at India International Trade Fair 2026

Power Ministry Showcases BESS, Vanadium Flow Batteries at India International Trade Fair 2026

November 16, 2026

Waaree ESS Starts Commercial Production at 5.15 GWh Battery Pack Line in Gujarat

November 16, 2026
NYSERDA Launches 1 GW Energy Storage Solicitation in New York

NYSERDA Launches 1 GW Energy Storage Solicitation in New York

November 16, 2026
Sungrow Unveils Keeper Family of Modular C&I Energy Storage Solutions

Sungrow Unveils Keeper Family of Modular C&I Energy Storage Solutions

November 16, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.