Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » LONGi Secures 10th Consecutive BNEF Tier 1 Energy Storage Listing Amid Stricter Financing Criteria
Battery Manufacturing (BESS)

LONGi Secures 10th Consecutive BNEF Tier 1 Energy Storage Listing Amid Stricter Financing Criteria

Shivangi GuptaBy Shivangi GuptaNovember 4, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
LONGi Secures 10th Consecutive BNEF Tier 1 Energy Storage Listing Amid Stricter Financing Criteria

LONGi has secured its 10th consecutive quarterly inclusion in BloombergNEF’s (BNEF) Tier 1 global energy storage manufacturers list for Q4 2026, reinforcing its position in the energy storage market amid tighter project financing requirements. The latest recognition reflects the company’s track record in project delivery, system integration and commercial execution.

The Q4 2026 assessment introduced stricter financing criteria, requiring qualifying projects to secure non-recourse financing from at least two commercial banks. The revised requirements place greater emphasis on project bankability and commercial viability, adding significance to LONGi’s continued inclusion in the list.

LONGi Strengthens Energy Storage Capabilities Through Integrated Technology

Under its LONGi ONE strategy, the company has developed an integrated 5S technology platform comprising intelligent Control and Coordination System (iCCS), Battery Management System (BMS), Power Conversion System (PCS), Thermal Management System (TMS) and Energy Management System (EMS).

The in-house platform supports system integration and coordinated management across utility-scale energy storage, commercial and industrial (C&I) applications, and microgrid projects.

LONGi combines proprietary technologies with integrated system design to support operational performance and project execution. Its unified responsibility framework and Long-Term Service Agreements (LTSA) are designed to provide support throughout the energy storage project lifecycle.

Global Energy Storage Projects Showcase LONGi’s Capabilities

LONGi’s international project portfolio demonstrates the deployment of its energy storage solutions across different power markets and operating environments.

In Australia, the 5 MW/20 MWh Lunio Energy project in South Australia was connected to the grid in September 2026 and entered the National Electricity Market (NEM), enabling participation in electricity market trading.

In Germany, an energy storage project in Stralsund integrated battery storage with an existing solar-thermal plant. The system delivers frequency response in under 50 milliseconds, supporting grid stability and power quality for critical infrastructure.

In Finland, LONGi’s microgrid solution achieved black start in under two minutes, enabling independent power supply in extreme cold conditions. Meanwhile, in coastal Italy, a 50.16 MWh energy storage system integrated with a 35 MWp solar plant incorporates comprehensive anti-corrosion protection and maintains reported system availability exceeding 99% in high-salt and high-humidity conditions.

LONGi Expands Manufacturing and Global Energy Storage Operations

LONGi continues to strengthen its energy storage capabilities through technology development, integrated solutions, global project execution and lifecycle services. The company said the launch of its new smart manufacturing base further enhances its manufacturing and delivery capabilities for international markets.

Going forward, LONGi plans to advance its LONGi ONE strategy by combining full-stack technology innovation, global project experience, smart manufacturing and localized services to deliver energy storage solutions and support the global energy transition.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage systems BNEF Tier 1 energy storage global energy storage market global news LONGi
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Grasim, Suzlon Partner to Develop India's Wind Turbines with Recyclable Blades

Grasim, Suzlon Partner to Develop India’s Wind Turbines with Recyclable Blades

Sungrow Commissions 1,243 MWh Hams Hall BESS in UK Within 20 Days

Sungrow Commissions 1,243 MWh Hams Hall BESS in UK Within 20 Days

CERC Grants 100% ISTS Waiver to Tata Power’s 198 MW Tamil Nadu Wind Project

CERC Grants 100% ISTS Waiver to Tata Power’s 198 MW Tamil Nadu Wind Project

Leave A Reply Cancel Reply

2 × 5 =

Renewable energy
Grasim, Suzlon Partner to Develop India's Wind Turbines with Recyclable Blades

Grasim, Suzlon Partner to Develop India’s Wind Turbines with Recyclable Blades

November 4, 2026
CERC Grants 100% ISTS Waiver to Tata Power’s 198 MW Tamil Nadu Wind Project

CERC Grants 100% ISTS Waiver to Tata Power’s 198 MW Tamil Nadu Wind Project

November 4, 2026
CleanMax Reports 56% H1 EBITDA Growth to ₹1,047 Crore, Maintains 1.5 GW FY27 Commissioning Target

CleanMax Reports 56% H1 EBITDA Growth to ₹1,047 Crore, Maintains 1.5 GW FY27 Commissioning Target

November 4, 2026
Odisha Attracts ₹1.17 Lakh Crore Investment Proposals for 11,742 MW Clean Energy Capacity at BRES 2026

Odisha Attracts ₹1.17 Lakh Crore Investment Proposals for 11,742 MW Clean Energy Capacity at BRES 2026

November 4, 2026
Batteries
Sungrow Commissions 1,243 MWh Hams Hall BESS in UK Within 20 Days

Sungrow Commissions 1,243 MWh Hams Hall BESS in UK Within 20 Days

November 4, 2026
Luminous Launches PIXEL Compact Inverter with 40% Smaller Design, 20% Faster Charging and Lithium-Ion Compatibility

Luminous Launches PIXEL Compact Inverter with 40% Smaller Design, 20% Faster Charging and Lithium-Ion Compatibility

November 4, 2026
Risen Energy Maintains BloombergNEF Tier 1 Energy Storage Status Throughout 2026

Risen Energy Maintains BloombergNEF Tier 1 Energy Storage Status Throughout 2026

November 4, 2026
LONGi Secures 10th Consecutive BNEF Tier 1 Energy Storage Listing Amid Stricter Financing Criteria

LONGi Secures 10th Consecutive BNEF Tier 1 Energy Storage Listing Amid Stricter Financing Criteria

November 4, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.