Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » MSEDCL Awards 2 GW/4 GWh BESS Capacity at Rs 2.38–2.40 Lakh/MW/Month
Battery Manufacturing (BESS)

MSEDCL Awards 2 GW/4 GWh BESS Capacity at Rs 2.38–2.40 Lakh/MW/Month

Shivangi GuptaBy Shivangi GuptaSeptember 22, 20264 Mins Read
Facebook Twitter LinkedIn WhatsApp
MSEDCL Awards 2 GW/4 GWh BESS Capacity at Rs 2.38–2.40 Lakh/MW/Month

Maharashtra State Electricity Distribution Company Limited (MSEDCL) has finalised the successful bidders for its 2,000 MW/4,000 MWh (2 GW/4 GWh) Battery Energy Storage System (BESS) tender in Maharashtra. The auction discovered tariffs of ₹2.38 lakh/MW/month for Part A and ₹2.40 lakh/MW/month for Part B.

The tender divided the total 2,000 MW capacity into two segments: Part A covering 1,500 MW and Part B covering 500 MW. The awards were finalised through a competitive bidding process, with multiple developers securing capacity under the respective segments.

MSEDCL BESS Auction Results

Part Successful Bidder Capacity Secured Tariff
A Oriana Power 500 MW ₹2.38 lakh/MW/month
A BSL Engineering Service 300 MW ₹2.38 lakh/MW/month
A ArMee Infotech 250 MW ₹2.38 lakh/MW/month
A Stockwell Solar Services 150 MW ₹2.38 lakh/MW/month
A GK Energy 150 MW ₹2.38 lakh/MW/month
A Claro Energy 100 MW ₹2.38 lakh/MW/month
A Jailaxmi Sugar Products (Nitali) 50 MW ₹2.38 lakh/MW/month
B Aditya Green Energy 40 MW ₹2.40 lakh/MW/month
B Kotecha Sales 20 MW ₹2.40 lakh/MW/month
B Rudraksha Power 20 MW ₹2.40 lakh/MW/month
B Gurutura Green Energy 20 MW ₹2.40 lakh/MW/month
B Oriana Power 400 MW ₹2.40 lakh/MW/month

Part A Awards 1,500 MW

Under Part A, MSEDCL awarded the entire 1,500 MW at a tariff of ₹2.38 lakh/MW/month. Oriana Power emerged with the largest allocation of 500 MW, followed by BSL Engineering Service with 300 MW and ArMee Infotech with 250 MW.

Stockwell Solar Services and GK Energy each secured 150 MW, while Claro Energy received 100 MW and Jailaxmi Sugar Products (Nitali) secured 50 MW.

GK Energy secured its 150 MW allocation from the 1,250 MW capacity quoted under the bucket-filling mechanism.

Part B Awards 500 MW

The remaining 500 MW under Part B was awarded at ₹2.40 lakh/MW/month. Oriana Power secured the largest share with 400 MW, while Aditya Green Energy received 40 MW.

Kotecha Sales, Rudraksha Power and Gurutura Green Energy each secured 20 MW.

Oriana Power was allocated 400 MW from the 500 MW it quoted under the bucket-filling mechanism.

Fresh Tender Follows APTEL Order

MSEDCL floated the fresh tender in June 2026 following an order by the Appellate Tribunal for Electricity (APTEL). The tribunal had set aside an earlier 2 GW/4 GWh BESS tender approved by the Maharashtra Electricity Regulatory Commission (MERC).

The earlier tender had increased the required utilisation from 5,475 cycles to 6,300 cycles, which APTEL determined represented a material change in the tender conditions. A fresh bidding process was subsequently directed.

The new tender retained a provision allowing MSEDCL to utilise the BESS for at least 6,300 cycles during the contract period without additional cost. The earlier auction had resulted in an L1 tariff of ₹1.65 lakh/MW/month.

VGF and Technical Requirements

The selected BESS projects will be eligible for Viability Gap Funding (VGF) of up to ₹18 lakh/MW. The Battery Energy Storage Purchase Agreements (BESPAs) will have a tenure of 15 years.

Developers will also be required to maintain at least 95% annual system availability and achieve a minimum 85% AC-to-AC round-trip efficiency (RTE) on a monthly basis.

The tender includes domestic-content requirements for the projects. The Energy Management System (EMS) application software used for the BESS installations must be developed indigenously. Developers are also required to maintain a minimum 20% local content of the total project cost, including the indigenous EMS software.

Oriana Power and GK Energy

Oriana Power has secured a combined 900 MW through the auction, comprising 500 MW under Part A and 400 MW under Part B. According to the company’s regulatory filing, the aggregate consideration under its two LoAs over the 15-year BESPA period is estimated at approximately ₹3,870 crore.

The company expects VGF support of approximately ₹324 crore, based on the current estimated project cost.

For GK Energy, the award marks its entry into the BESS segment. The company secured 150 MW/300 MWh at ₹2.38 lakh/MW/month. GK Energy expects the project to generate annual revenue of approximately ₹42.84 crore, excluding GST, for 15 years from the commencement of commercial operations.

The finalisation of the 2 GW/4 GWh auction adds a significant pipeline of utility-scale energy storage capacity in Maharashtra and provides multiple developers with long-term opportunities to deploy BESS infrastructure under 15-year agreements.

Capacity 2,000 MW/4,000 MWh (2 GW/4 GWh) Battery Energy Storage System (BESS)
Location Maharashtra
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Battery Energy Storage System energy storage GK Energy India News Maharashtra MSEDCL BESS Oriana Power
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

WAAREE TRANSPOWER Appoints Neeraj Goyal as Chief Executive Officer

WAAREE TRANSPOWER Appoints Neeraj Goyal as Chief Executive Officer

WAAREE TRANSPOWER Appoints Rahul Chauhan as Vice President – Sales

WAAREE TRANSPOWER Appoints Rahul Chauhan as Vice President – Sales

Avaada Group Elevates Altaf Tamboli to Vice President

Avaada Group Elevates Altaf Tamboli to Vice President

Leave A Reply Cancel Reply

six + 13 =

Renewable energy
WAAREE TRANSPOWER Appoints Neeraj Goyal as Chief Executive Officer

WAAREE TRANSPOWER Appoints Neeraj Goyal as Chief Executive Officer

September 22, 2026
WAAREE TRANSPOWER Appoints Rahul Chauhan as Vice President – Sales

WAAREE TRANSPOWER Appoints Rahul Chauhan as Vice President – Sales

September 22, 2026
Avaada Group Elevates Altaf Tamboli to Vice President

Avaada Group Elevates Altaf Tamboli to Vice President

September 22, 2026
Sterling and Wilson Renewable Energy Secures Rs 985 Crore Orders in India and South Africa

Sterling and Wilson Renewable Energy Secures Rs 985 Crore Orders in India and South Africa

September 22, 2026
Batteries
Exide Energy International Enters Long-Term Cooperation Agreement With ExCom Energy Solutions

Exide Energy International Enters Long-Term Cooperation Agreement With ExCom Energy Solutions

September 22, 2026
Attero Operationalises Greater Noida R&D Centre to Advance Critical Mineral Recovery Technologies

Attero Operationalises Greater Noida R&D Centre to Advance Critical Mineral Recovery Technologies

September 22, 2026
MSEDCL Awards 2 GW/4 GWh BESS Capacity at Rs 2.38–2.40 Lakh/MW/Month

MSEDCL Awards 2 GW/4 GWh BESS Capacity at Rs 2.38–2.40 Lakh/MW/Month

September 22, 2026
LG Energy Solution’s BESS Qualifies as NVIDIA DSX Ready BESS

LG Energy Solution’s BESS Qualifies as NVIDIA DSX Ready BESS

September 22, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.