Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » SECI Invites BESS Suppliers for Nationwide Grid-Scale Storage Empanelment
Tenders

SECI Invites BESS Suppliers for Nationwide Grid-Scale Storage Empanelment

Shivangi GuptaBy Shivangi GuptaNovember 18, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
SECI Invites BESS Suppliers for Nationwide Grid-Scale Storage Empanelment

Solar Energy Corporation of India Limited (SECI) has issued a Request for Empanelment (RfE) to onboard manufacturers, suppliers, system integrators and aggregators of grid-interactive Battery Energy Storage Systems (BESS) across India. Issued on November 17, 2026, the tender aims to create a pre-qualified vendor pool for upcoming utility-scale energy storage projects and support the integration of renewable energy into the national power grid.

The empanelment will follow a two-stage selection process. In the first stage, SECI will evaluate applicants based on their technical and financial credentials without seeking price bids. Qualified bidders will be placed into four categories based on their eligible project procurement capacity.

The four empanelment categories are:

  • Tier I: Projects up to 100 MWh.
  • Tier II: Above 100 MWh and up to 300 MWh.
  • Tier III: Above 300 MWh and up to 600 MWh.
  • Tier IV: Above 600 MWh and up to 1,000 MWh.

Vendors qualifying for a higher tier will automatically be eligible for all lower tiers.

In the second stage, SECI will invite empanelled vendors to participate in project-specific Requests for Quotations (RfQs) as and when storage procurement requirements arise. Project contracts will be awarded through an Electronic Reverse Auction (e-RA). The empanelment will remain valid for one year from its effective date, although selection will not guarantee any minimum order or business commitment.

Rolling Submission Process and Eligibility Requirements

Unlike conventional tenders with a single submission deadline, SECI has introduced a rolling empanelment process. Applications can be submitted by the last working day of each month until the corporation announces the closure of the process. Bid openings will take place on the first working day of the following month. Applicants must report any discrepancies in the tender documents within 20 days of its issuance, while submitted bids must remain valid for 12 months.

Key financial and bidding requirements include:

  • Processing Fee: ₹5,000 plus 18% GST, which is non-refundable. Micro and Small Enterprises with valid UDYAM registration are exempt.
  • Earnest Money Deposit (EMD): No EMD is required at the initial bidding stage.
  • Empanelment Bank Guarantee: Selected vendors must submit a bank guarantee ranging from ₹1.86 crore for Tier I to ₹18.60 crore for Tier IV.
  • Annual Empanelment Fee: Ranges from ₹25,000 to ₹1 lakh, excluding GST, depending on the applicable category.
  • Alternative Financial Instruments: SECI permits Payment on Order Instruments from REC or PFC and eligible Insurance Surety Bonds.

Performance Guarantees and Liquidated Damages

The tender does not specify a fixed Contract Performance Guarantee amount at the empanelment stage. Instead, the applicable guarantee will be determined in individual project-specific RfQs.

Suppliers may face liquidated damages of up to 5% of the contract price separately for supply delays and commissioning delays. Vendors opting for the optional 10% interest-free mobilisation advance must also submit a separate bank guarantee covering 110% of the advance amount.

Through the rolling empanelment mechanism, SECI aims to maintain a pool of qualified BESS suppliers that can participate in future storage procurement opportunities without undergoing the initial qualification process for every project.

Capacity Up to 1,000 MWh per eligible procurement category (Tier IV). The tender does not specify an overall BESS procurement capacity.
Location Pan India
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage BESS tender energy storage India Grid-Scale BESS India News SECI
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Tata Steel plans hydrogen production project using steel plant off-gases at Kalinganagar, Odisha

Tata Steel plans hydrogen production project using steel plant off-gases at Kalinganagar, Odisha

FranklinWH Energy Storage Inc. Launches Virtual Power Plant Service at RE+

FranklinWH Energy Storage Inc. Launches Virtual Power Plant Service at RE+

POWERGRID Invites Bids for 100 MW/400 MWh BESS Project in Andhra Pradesh

POWERGRID Invites Bids for 100 MW/400 MWh BESS Project in Andhra Pradesh

Leave A Reply Cancel Reply

eleven + one =

Renewable energy
Tata Steel plans hydrogen production project using steel plant off-gases at Kalinganagar, Odisha

Tata Steel plans hydrogen production project using steel plant off-gases at Kalinganagar, Odisha

November 18, 2026
U.S. Energy Storage Installations Surpass 200 GWh Milestone

U.S. Energy Storage Installations Surpass 200 GWh Milestone

November 18, 2026
ADB, Bangladesh Expand Partnership to Develop 1,000 MW of Solar and Battery Storage

ADB, Bangladesh Expand Partnership to Develop 1,000 MW of Solar and Battery Storage

November 18, 2026
Haryana Increases Solar Subsidy Limit to 30 kW for Shrimp Farmers

Haryana Increases Solar Subsidy Limit to 30 kW for Shrimp Farmers

November 18, 2026
Batteries
FranklinWH Energy Storage Inc. Launches Virtual Power Plant Service at RE+

FranklinWH Energy Storage Inc. Launches Virtual Power Plant Service at RE+

November 18, 2026
POWERGRID Invites Bids for 100 MW/400 MWh BESS Project in Andhra Pradesh

POWERGRID Invites Bids for 100 MW/400 MWh BESS Project in Andhra Pradesh

November 18, 2026
ACME Solar Signs 150 MW Hybrid Power PPA with NTPC at ₹3.21 per Unit

ACME Solar Signs 150 MW Hybrid Power PPA with NTPC at ₹3.21 per Unit

November 18, 2026
Create Energy Partners with Ampt to Expand ONTRACK Solar and BESS Solutions

Create Energy Partners with Ampt to Expand ONTRACK Solar and BESS Solutions

November 18, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.