Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » Energy Storage Tender » SECI Invites Bids for PMU Procurement for 100 MW Solar with 40 MW/120 MWh BESS Project in Chhattisgarh
Energy Storage Tender

SECI Invites Bids for PMU Procurement for 100 MW Solar with 40 MW/120 MWh BESS Project in Chhattisgarh

PrakashBy PrakashAugust 7, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
SECI Invites Bids for PMU Procurement for 100 MW Solar-BESS Project in Chhattisgarh

Solar Energy Corporation of India Limited (SECI) has invited online bids for the procurement of a Phasor Measurement Unit (PMU) for the 100 MW Solar Photovoltaic (SPV) with 40 MW/120 MWh Battery Energy Storage System (BESS) Project at Rajnandgaon, Chhattisgarh.

The scope of the tender covers the procurement of a Phasor Measurement Unit (PMU) for the 100 MW SPV with 40 MW/120 MWh BESS Project located at Rajnandgaon, Chhattisgarh.

The tender was published on 6 August 2026. A pre-bid meeting has been scheduled for 12 August 2026. The deadline for both online and offline bid submissions is 27 August 2026, while the bids will be opened on the same day.

The tender carries a bid processing fee of ₹5,900 and requires an Earnest Money Deposit (EMD) of ₹72,000. The selected bidder will be required to furnish a Performance Bank Guarantee (PBG) of 5%, valid for a period of 8 months and 15 days.

Interested bidders may participate in the tender through the designated online procurement portal in accordance with the terms and conditions specified in the tender document.

Solar Energy Corporation of India Limited (SECI) is the foremost Navratna CPSU dedicated to the growth and development of Renewable Energy (RE) capacity in India.

To realise India’s ambitious RE targets, the Government of India designated SECI as a nodal agency to enable meeting the growing energy demand through RE and reducing the dependence on fossil fuels. Looking at the huge success of SECI’s performance over the years, the government has appointed other agencies also, designating these as Renewable Energy Implementing Agencies (REIAs), for working towards the common goal of RE expansion.

Capacity 100 MW Solar and 40 MW/120 MWh BESS
Location Rajnandgaon, Chhattisgarh
Last Date 27/08/2026
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS India News renewable energy SECI Solar plus BESS
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

InSolare Energy Unveils New Brand Identity for Net-Zero Focus

InSolare Energy Unveils New Brand Identity for Net-Zero Focus

POWERGRID Appoints Akhilesh Pathak as Director (Projects)

POWERGRID Appoints Akhilesh Pathak as Director (Projects)

Adani Green Energy expands battery storage capacity to 6.63 GWh; accounts for more than 50% of India's operational Battery Energy Storage System capacity

Adani Green Takes BESS Capacity to 6.63 GWh, Crosses 50% of India’s Total

Leave A Reply Cancel Reply

13 + three =

Renewable energy
InSolare Energy Unveils New Brand Identity for Net-Zero Focus

InSolare Energy Unveils New Brand Identity for Net-Zero Focus

October 1, 2026
Jakson Green Elevates Sudhir Nain as COO – India Renewable Business

Jakson Green Elevates Sudhir Nain as COO – India Renewable Business

October 1, 2026
Waaree Energies Promotes Vishal Upadhyay to Vice President – Human Resources

Waaree Energies Promotes Vishal Upadhyay to Vice President – Human Resources

October 1, 2026
TDB Clarifies RDI Scheme Call Closure, Says No Fund Shortage

TDB Clarifies RDI Scheme Call Closure, Says No Fund Shortage

October 1, 2026
Batteries
LG Energy Solution, indiGOtech Explore 46-Series Batteries for U.S. Electric Vans

LG Energy Solution, indiGOtech Explore 46-Series Batteries for U.S. Electric Vans

October 1, 2026
Adani Green Energy expands battery storage capacity to 6.63 GWh; accounts for more than 50% of India's operational Battery Energy Storage System capacity

Adani Green Takes BESS Capacity to 6.63 GWh, Crosses 50% of India’s Total

October 1, 2026
ACME Solar Commissions 53.63 MW BESS Phase-III in Rajasthan

ACME Solar Commissions 53.63 MW BESS Phase-III in Rajasthan

October 1, 2026
Europe Needs More Storage and Flexibility to Strengthen Energy Resilience

Europe Needs More Storage and Flexibility to Strengthen Energy Resilience

September 30, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.