Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Wärtsilä Achieves Milestone with Fourth Phase of Eraring Battery Storage
Batteries

Wärtsilä Achieves Milestone with Fourth Phase of Eraring Battery Storage

ManshiBy ManshiDecember 11, 20252 Mins Read
Facebook Twitter LinkedIn WhatsApp
Wärtsilä Achieves Milestone with Fourth Phase of Eraring Battery Storage

Technology group Wärtsilä is set to deliver Stage 4 of the Eraring battery facility at Origin Energy’s Eraring Power Station in New South Wales, Australia. This expansion adds 360 MWh of new energy storage capacity, taking the total Eraring battery capacity to 700 MW / 3,160 MWh, making it Australia’s largest and one of the world’s biggest battery projects. Wärtsilä and Origin continue to lead the way in driving a 100% renewable energy future. Order booked in Q4 2025.

With this extension, the project will provide increased capacity to help balance the grid as renewable generation grows and coal-fired plants retire. The Eraring battery connects to Australia’s National Electricity Market (NEM) and provides critical grid services, including frequency control, firming capacity, and system strength support, that enhance system security and reliability as variable renewable energy supply increases.

As energy storage systems increase to the GWh scale, the number of data points needed to be managed grows exponentially. Wärtsilä’s market-leading GEMS Digital Energy Platform is designed to manage a complex project like Eraring, optimising performance, reliability, and value. Stage 4 will utilise Wärtsilä’s fully integrated, modular, and compact Quantum energy storage system. The project is supported by a multi-term service agreement, ensuring long-term reliability and optimal system efficiency.

“This extension marks another important milestone in Wärtsilä’s path towards enabling a secure, renewable energy future in Australia and around the world,” says Tamara de Gruyter, President, Wärtsilä Energy Storage and EVP, Wärtsilä. “Alongside Origin, we are setting a new global benchmark for large-scale energy storage with one of the largest and most advanced battery energy storage facilities in the world.”

Origin selected Wärtsilä for Stage 1 of the project in 2023, and for Stages 2 and 3 in 2024. Together, these stages have established Eraring as a cornerstone project in Australia’s clean energy transition and one of the world’s largest battery energy storage facilities.

The Stage 4 extension will commence in December 2025 and is expected to be completed by early 2027. With Stage 4 underway, Wärtsilä’s energy storage portfolio in Australia now exceeds 5.8GWh.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS energy storage global news Power Station renewable energy Wärtsilä
Manshi
  • Website

I'm journalism graduate with professional experience working across different news websites. I have been involved in news reporting, content writing, and digital media coverage, which has helped me develop a strong understanding of current affairs and storytelling. Currently, I am working with Battery Magazine, where I continue to create accurate, engaging, and reader-focused news content.

Keep Reading

NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Comments are closed.

Renewable energy
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Kyro Capital

Kyro Capital Launches ₹100 Crore Pre-IPO Fund Targeting Renewable Energy and Growth Sectors

June 3, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.