Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » EV & Charging » 88,209 EVs were subsidized in Madhya Pradesh in FY 2025-26 under the PM E-DRIVE scheme
EV & Charging

88,209 EVs were subsidized in Madhya Pradesh in FY 2025-26 under the PM E-DRIVE scheme

Shivangi GuptaBy Shivangi GuptaAugust 13, 20264 Mins Read
Facebook Twitter LinkedIn WhatsApp
88,209 EVs were subsidized in Madhya Pradesh in FY 2025-26 under the PM E-DRIVE scheme

Madhya Pradesh deployed 94,277 electric vehicles (EVs) under the PM E-DRIVE program in FY 2025–2026. In Madhya Pradesh, 88,209 EVs were subsidised in FY 2025–2026; specifics are given in Annexure. Madhya Pradesh has not been given any electric buses under the PM E-DRIVE Scheme. The entire amount of demand incentives given directly to car buyers and original equipment manufacturers running distribution networks in Madhya Pradesh is not kept up to date centrally. The Ministry of Heavy Industries has not conducted any such evaluations.

The Government has implemented following schemes on pan India basis including two-tier and three-tier towns of Madhya Pradesh to promote the use of clean energy transport systems:

Faster Adoption and Manufacturing of (Hybrid &) Electric Vehicles in India (FAME India) Scheme Phase-II: The Government implemented this scheme for a period of five years from 01.04.2019 to 31.03.2024 with a total budgetary support of ₹11,500 crore. The scheme provided demand incentive for e-2Ws, e-3Ws, e-4Ws and grants for e-buses and setting up of EV public charging stations (EV PCS). FAME-II has supported the sale of approximately 16.72 lakh electric vehicles including e-2Ws, e-3Ws & e-4Ws and 6,862 e-buses were sanctioned for various cities out of which 5,299 e-buses have been deployed as on 31.07.2026. Under this scheme ₹912.50 crore have been allocated for setting up of EV PCS.

Production Linked Incentive (PLI) Scheme for Automobile and Auto Component Industry in India (PLI-Auto): The Government notified this scheme for Automobile and Auto Component Industry in India, on 23.09.2021, for enhancing India’s manufacturing capabilities for Advanced Automotive Technology (AAT) products, including EVs, with a budgetary outlay of ₹25,938 crore.

Production Linked Incentive (PLI) Scheme for National Programme on Advanced Chemistry Cell (ACC) Battery Storage : The Government on 09.06.2021 notified the PLI Scheme for manufacturing of ACC in the country with a budgetary outlay of ₹18,100 crore. The scheme aims to establish a competitive domestic manufacturing ecosystem for 50 GWh of ACC batteries.

PM Electric Drive Revolution in Innovative Vehicle Enhancement (PM EDRIVE) Scheme: This scheme with an outlay of ₹10,900 crore has been notified on 29.09.2024. This scheme supports incentivization of approximately 28.30 lakh electric vehicles (EVs) including e-2W, e-3W, e-Trucks, e-buses and e-Ambulances. Further, grant for upgradation of testing agencies is also available under this scheme. An allocation of ₹4,391 crore has been made under the scheme for deployment of 14,028 e-buses out of which 14,000 e-buses have been allocated. ₹2,000 crore has been allocated for deployment of EV PCS on pan India basis.

PM e-Bus Sewa-Payment Security Mechanism (PSM) Scheme: This Scheme notified on 28.10.2024, has an outlay of ₹3,435.33 crore and aims to support deployment of more than 38,000 electric buses. The objective of this scheme is to provide payment security to e-bus operators in case of default by Public Transport Authorities (PTAs).

Further, following initiatives have also been taken up by the Government of India to increase the use of electric vehicles in the country:–

i. GST on electric vehicles and chargers/ charging stations for electric vehicles has been reduced to 5%.

ii. Ministry of Road Transport & Highways (MoRTH) announced that battery-operated vehicles will be given green license plates and be exempted from permit requirements.

iii. MoRTH issued a notification advising states to waive road tax on EVs, which in turn will help reduce the initial cost of EVs.

District e-2W e-3Ws Total
Agar Malwa 64 — 64
Alirajpur 65 — 65
Anuppur 204 19 223
Ashok Nagar 1,149 13 1,162
Balaghat 772 13 785
Barwani 409 2 411
Betul 1,023 20 1,043
Bhind 1,282 141 1,423
Bhopal 6,509 113 6,622
Burhanpur 226 2 228
Chhatarpur 1,160 23 1,183
Chhindwara 2,606 77 2,683
Damoh 671 138 809
Datia 513 58 571
Dewas 2,078 61 2,139
Dhar 1,233 22 1,255
Dindori 62 60 122
Guna 2,392 33 2,425
Gwalior 8,987 489 9,476
Harda 790 1 791
Indore 11,347 1,493 12,840
Jabalpur 6,905 1,008 7,913
Jhabua 86 — 86
Katni 757 567 1,324
Khandwa 376 17 393
Khargone 499 20 519
Maihar 13 8 21
Mandla 280 24 304
Mandsaur 1,818 14 1,832
Mauganj 5 3 8
Morena 1,949 199 2,148
Narmadapuram 1,662 26 1,688
Narsimhapur 1,909 58 1,967
Neemuch 772 3 775
Niwari 7 1 8
Pandhurna 12 — 12
Panna 146 50 196
Raisen 953 21 974
Rajgarh 782 5 787
Ratlam 1,704 23 1,727
Rewa 1,130 331 1,461
Sagar 2,285 400 2,685
Satna 1,117 383 1,500
Sehore 1,711 19 1,730
Seoni 1,020 19 1,039
Shahdol 738 55 793
Shajapur 847 21 868
Sheopur 588 10 598
Shivpuri 1,708 37 1,745
Sidhi 241 44 285
Singrauli 257 23 280
Tikamgarh 550 32 582
Ujjain 3,490 132 3,622
Umaria 176 29 205
Vidisha 1,805 9 1,814
Total 81,840 6,369 88,209

 

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
clean energy electric vehicles energy infrastructure energy storage EV batteries EV charging India News
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Andhra Pradesh, TEXMiN Sign MoU to Build Critical Minerals and Rare Earth Research Ecosystem

Andhra Pradesh, TEXMiN Sign MoU to Build Critical Minerals and Rare Earth Research Ecosystem

Fluence Begins Construction of 400 MWh Battery Storage Project for LEAG in Germany

Fluence Begins Construction of 400 MWh Battery Storage Project for LEAG in Germany

From Promise to Deployment: Debmalya Sen on India's Energy Storage Leap

From Promise to Deployment: Debmalya Sen on India’s Energy Storage Leap

Leave A Reply Cancel Reply

15 + 16 =

Renewable energy
Andhra Pradesh, TEXMiN Sign MoU to Build Critical Minerals and Rare Earth Research Ecosystem

Andhra Pradesh, TEXMiN Sign MoU to Build Critical Minerals and Rare Earth Research Ecosystem

August 14, 2026
Fluence Begins Construction of 400 MWh Battery Storage Project for LEAG in Germany

Fluence Begins Construction of 400 MWh Battery Storage Project for LEAG in Germany

August 14, 2026
Tamil Nadu CM C. Joseph Vijay Inaugurates Vikram Solar’s 6 GW Solar Module Manufacturing Facility in Tirunelveli

Tamil Nadu CM C. Joseph Vijay Inaugurates Vikram Solar’s 6 GW Solar Module Manufacturing Facility in Tirunelveli

August 14, 2026
India Smart Grid Forum Appoints Reena Suri as CEO

India Smart Grid Forum Appoints Reena Suri as CEO

August 14, 2026
Batteries
SWELECT Reports Q1 FY27 Consolidated PAT of INR 765.33 Lakhs

SWELECT Reports Q1 FY27 Consolidated PAT of INR 765.33 Lakhs

August 14, 2026
Hinduja Group Announces ₹2,500 Crore Investment in Tamil Nadu for Clean Energy and Mobility

Hinduja Group Announces ₹2,500 Crore Investment in Tamil Nadu for Clean Energy and Mobility

August 14, 2026
Arevon Energy Commissions 300 MW/1,200 MWh Nighthawk Energy Storage Project in California

Arevon Energy Commissions 300 MW/1,200 MWh Nighthawk Energy Storage Project in California

August 14, 2026
Fujiyama Power Systems Q1 FY27 Revenue Jumps 125 percent

Fujiyama Power Systems Q1 FY27 Revenue Jumps 125%; 2 GW Battery Capacity Nears Commissioning

August 14, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.