Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » Cabinet Approves Green Energy Corridor Phase-III with BESS
Battery Manufacturing (BESS)

Cabinet Approves Green Energy Corridor Phase-III with BESS

Shivangi GuptaBy Shivangi GuptaSeptember 30, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Cabinet Approves Green Energy Corridor Phase-III with BESS

The Union Cabinet, chaired by Prime Minister Narendra Modi, has approved the Green Energy Corridor Phase-III (GEC-III) scheme to strengthen India’s Intra-State Transmission System (InSTS). The initiative aims to facilitate the evacuation of up to 135 GW of renewable energy across States and Union Territories.

The scheme also provides for deployment of 50 GWh of Battery Energy Storage Systems (BESS) at the Renewable Energy (RE) developer/generator end or any other location of importance for grid flexibility to address intermittency, congestion, peak-hour curtailment and meet non-solar hour demand. The scheme will facilitate grid integration and power evacuation with in the States/UTs of India.

The scheme is targeted to be set up by FY 2032-33 with total project outlay of Rs.1,86,405 crore, comprising Rs.1,36,378 crore for the development of Intra-State Transmission Systems (InSTS) under GEC-III, Rs.50,000 crore for 50 GWh of Battery Energy Storage Systems (BESS). The Scheme involves a total Central Financial Support of Rs.54,082 crore. The Central Financial Assistance (CFA) will help in offsetting the Intra-State transmission charges and thus keep the power costs down. Thus, the Government support will ultimately benefit the end users – the citizens of India.

All Greenfield projects under the InSTS component will be implemented through Tariff Based Competitive Bidding (TBCB) mode, while brownfield upgradation and network strengthening works will be executed under Cost Plus Basis (CPB). The State Transmission Utilities will be the overall implementing agency, and Transmission Service Providers (TSPs) will participate under TBCB on a Build-Own-Operate-Maintain (BOOM) model.

The scheme will help in achieving the target of 900 GW installed Non-Fossil capacity by 2035. The scheme will also contribute to long term energy security of the country and promote ecologically sustainable growth by reducing carbon footprint. It will generate large direct & indirect employment in the power sector, manufacturing, and construction industries. Battery Energy Storage System (BESS) manufacturing and deployment will additionally generate employment in the domestic energy storage industry. The scheme will also generate long-term skilled employment in operation, maintenance, and grid management across participating States.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Battery Energy Storage System GEC Phase-III Green Energy Corridor India News Intra-State Transmission renewable energy
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

TrueRE Oriana Power Plans Five CBG Plants Across Three States

TrueRE Oriana Power Plans Five CBG Plants Across Three States

Bhutan Extends Chhukha Power Export Agreement with India

Bhutan, PTC India Extend Chhukha Hydropower Export Agreement Until 2031

MULTIFIT Strengthens Its Solar and Battery Storage Portfolio

MULTIFIT Expands Solar Storage Portfolio with Hybrid Inverters and Integrated Battery Systems

Leave A Reply Cancel Reply

fourteen − eight =

Renewable energy
TrueRE Oriana Power Plans Five CBG Plants Across Three States

TrueRE Oriana Power Plans Five CBG Plants Across Three States

November 20, 2026
Bhutan Extends Chhukha Power Export Agreement with India

Bhutan, PTC India Extend Chhukha Hydropower Export Agreement Until 2031

November 20, 2026
KKR Takes Minority Stake in Gentari’s India Renewables Platform

KKR Takes Minority Stake in Gentari’s India Renewables Platform

November 20, 2026
APTEL Scraps rs 0.50 Rate for Excess Wind Power

APTEL Orders Full Tariff Payment for Wind Power Beyond Normative CUF

November 20, 2026
Batteries
MULTIFIT Strengthens Its Solar and Battery Storage Portfolio

MULTIFIT Expands Solar Storage Portfolio with Hybrid Inverters and Integrated Battery Systems

November 20, 2026
Four Firms Advance Under Rare Earth Magnet Scheme

Coal India, ReNew Among Four Firms Advancing Under ₹7,280-Crore Rare Earth Magnet Scheme

November 20, 2026
Juniper Green Commissions 108.50 MWp Solar, 94.77 MWh BESS

Juniper Green Adds 108.50 MWp Solar and 94.77 MWh Storage to Portfolio

November 20, 2026
Midwest Energy Wins LoI for 1,200 MTPA Magnets

Midwest Energy Secures LoI for 1,200 MTPA Rare Earth Magnet Project Under Centre’s ₹7,280-Crore Scheme

November 20, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.