Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Solar » ENGIE Commissions 450 MW Solar Projects in Rajasthan and Gujarat
Solar

ENGIE Commissions 450 MW Solar Projects in Rajasthan and Gujarat

Shivangi GuptaBy Shivangi GuptaOctober 30, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
ENGIE Commissions 450 MW Solar Projects in Rajasthan and Gujarat

ENGIE has commissioned two solar power projects with a combined capacity of 450 MW in Rajasthan and Gujarat, expanding its renewable energy portfolio in India. The projects comprise a 250 MW solar plant in Khaba, Rajasthan, and a 200 MW solar photovoltaic (PV) plant at the Khavda Renewable Energy Park in Gujarat. Both facilities are fully operational and are expected to contribute to India’s renewable electricity generation.

The projects were developed through ENGIE’s wholly owned subsidiaries, Khaba Renewable Energy Private Limited and Enren II Energy Private Limited, respectively. Approximately 80% of the workforce employed during construction was recruited locally, supporting employment in the project regions.

250 MW Khaba Solar Project in Rajasthan

The 250 MW Khaba solar power project is located in Barmer district, Rajasthan. The facility is expected to generate approximately 650 gigawatt-hours (GWh) of electricity annually.

According to the company, the project is also expected to avoid around 180 kilotonnes of carbon dioxide emissions each year by generating electricity from renewable sources.

200 MW Khavda Solar Project in Gujarat

The second project is a 200 MW solar photovoltaic plant located within the Khavda Renewable Energy Park in the Rann of Kutch, Gujarat. Developed through Enren II Energy Private Limited, the facility is expected to generate approximately 350 GWh of electricity annually.

The project is backed by a 25-year power purchase agreement (PPA) with Gujarat Urja Vikas Nigam Limited (GUVNL), providing a long-term arrangement for the sale of electricity generated by the plant.

ENGIE Expands Renewable Energy and Storage Portfolio

The commissioning of the two solar projects adds to ENGIE’s renewable energy development activities in India. The company has approximately 2 GW of renewable energy capacity that is operational or under construction in the country.

ENGIE is also expanding into battery energy storage systems (BESS) and hybrid renewable energy projects. In November 2025, the company secured its first battery storage project in India, with a capacity of 280 MW/560 MWh.

In January 2026, ENGIE secured a hybrid project combining 200 MW of solar power capacity with a 100 MW/600 MWh battery energy storage system.

Alongside renewable generation and storage, the company is exploring opportunities in corporate power purchase agreements and energy management solutions to address evolving electricity market requirements.

The commissioning of the Khaba and Khavda projects strengthens ENGIE’s presence in India’s renewable energy sector, adding 450 MW of operational solar capacity to its portfolio.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
ENGIE Gujarat India News Rajasthan renewable energy Renewable Energy Solar Energy solar energy
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Avaada Electro Secures MNRE ALMM Listing for 7.117 GW TOPCon Solar Cell Capacity

Avaada Electro Secures MNRE ALMM Listing for 7.117 GW TOPCon Solar Cell Capacity

Suzlon Energy Q2 Revenue Rises 26% to ₹4,869 Crore as Net Profit Declines

Suzlon Energy Q2 Revenue Rises 26% to ₹4,869 Crore as Net Profit Declines

IESA Report Highlights Long-Duration Energy Storage as Key to India’s 500 GW Clean Energy Target

IESA Report Highlights Long-Duration Energy Storage as Key to India’s 500 GW Clean Energy Target

Leave A Reply Cancel Reply

14 + 7 =

Renewable energy
Avaada Electro Secures MNRE ALMM Listing for 7.117 GW TOPCon Solar Cell Capacity

Avaada Electro Secures MNRE ALMM Listing for 7.117 GW TOPCon Solar Cell Capacity

October 30, 2026
ENGIE Commissions 450 MW Solar Projects in Rajasthan and Gujarat

ENGIE Commissions 450 MW Solar Projects in Rajasthan and Gujarat

October 30, 2026
Suzlon Energy Q2 Revenue Rises 26% to ₹4,869 Crore as Net Profit Declines

Suzlon Energy Q2 Revenue Rises 26% to ₹4,869 Crore as Net Profit Declines

October 30, 2026
IESA Report Highlights Long-Duration Energy Storage as Key to India’s 500 GW Clean Energy Target

IESA Report Highlights Long-Duration Energy Storage as Key to India’s 500 GW Clean Energy Target

October 30, 2026
Batteries
Neopulse Energy Appointed Owner’s Engineer for Coal India’s 320 MWh BESS Project

Neopulse Energy Appointed Owner’s Engineer for Coal India’s 320 MWh BESS Project

October 30, 2026
Crux Arranges Financing for 40 MWh Battery Storage Project at UC San Diego

Crux Arranges Financing for 40 MWh Battery Storage Project at UC San Diego

October 30, 2026
Sigenergy Unveils AI-Enabled Sigen Neo, SigenTerra and SigenCube in India

Sigenergy Unveils AI-Enabled Sigen Neo, SigenTerra and SigenCube in India

October 30, 2026
SKF India (Industrial) Opens First SEED Centre to Strengthen Manufacturing Skills

SKF India (Industrial) Opens First SEED Centre to Strengthen Manufacturing Skills

October 30, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.