Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » GUVNL Invites Bids for 335 MW / 670 MWh Standalone BESS Projects in Gujarat With ₹18 Lakh/MWh VGF Support
Tenders

GUVNL Invites Bids for 335 MW / 670 MWh Standalone BESS Projects in Gujarat With ₹18 Lakh/MWh VGF Support

Shweta KumariBy Shweta KumariDecember 31, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
MPPMCL Floats Mega 750 MW / 1,500 MWh Battery Storage Tender in Madhya Pradesh

Gujarat Urja Vikas Nigam Limited (GUVNL) has floated a major tender to procure 335 MW / 670 MWh standalone Battery Energy Storage Systems (BESS) statewide, under a Build-Own-Operate (BOO) model. The initiative supports grid stability, renewable integration, and peak demand management. Eligible projects will receive Viability Gap Funding (VGF) at ₹18 lakh per MWh under the Power System Development Fund (PSDF) scheme.

Tender Overview

  • Authority: Gujarat Urja Vikas Nigam Limited (GUVNL)
  • Project Type: Standalone Battery Energy Storage System (BESS)
  • Total Capacity: 335 MW / 670 MWh
  • Model: Build-Own-Operate (BOO)
  • Connection: Intra-State Transmission System (InSTS) at 20 identified substations across Gujarat
  • VGF Support: ₹18 lakh per MWh under PSDF Phase-VIII
  • Tender Type: Tariff-based Competitive Bidding with VGF
  • Phase: Phase-VIII BESS tender

2. Technical & Operational Requirements

Project Configuration

  • Minimum Bid Size: 130 MWh (equivalent to 65 MW × 2 hours).
  • Total BESS Capacity: Up to 670 MWh per project site configuration.

Performance Standards

  • Operational Cycles: System must support two complete charge–discharge cycles per day.
  • System Availability: Minimum 95 % availability annually guaranteed by the developer.
  • Discharge Capability: When fully charged, capable of discharging rated capacity during any 15-minute time block as scheduled by the State Load Dispatch Centre (SLDC).
  • Modular Dispatch: Must permit charging/discharging in groups from 50 MW/100 MWh up to 100 MW/200 MWh increments.

3. Technology & Compliance Conditions

Allowed Technology

  • Technology–Agnostic Batteries: Bidders may propose any battery chemistry/techno­logy that meets performance specs.
  • Quality Compliance: Must adhere to industrial quality, safety, and reliability norms.
  • Local Content: Minimum 20 % domestic content, inclusive of at least an indigenously developed Energy Management System (EMS) software.
  • Integration Responsibility: BESSD must ensure the facility is connected to the state grid at designated transmission points.

4. Bid Financials & Guarantees

Fees & Deposits

  • Tender Document Fee: ₹29,500 (inclusive of GST).
  • Document Processing Fee: ₹15 lakh + GST.
  • Earnest Money Deposit (EMD): ₹5 lakh per MW quoted.
  • Performance Bank Guarantee (PBG): ₹12.50 lakh per MW (must be furnished before signing Battery Energy Storage Purchase Agreement – BESPA).

5. Contract & Operational Terms

Charging & Discharging

  • Power Supply for Charging: Provided by GUVNL.
  • Auxiliary Power: Option to draw from the point of interconnection or through a separate metered connection.
  • Dispatch Control: Charging/discharging scheduled by SLDC based on grid requirements.

Service Duration

  • BESS must be available daily for operational cycles, with guaranteed system reliability & uptime as per contract terms.

6. Bid Submission Details

Key Dates

  • Online Bid Submission Deadline: 22 January 2026.
  • Offline Bid Submission Deadline: 27 January 2026.
  • Techno-Commercial Bid Opening: 28 January 2026.

Evaluation Process

Bids will typically be evaluated on techno-commercial parameters and quoted prices, with VGF support factored into financial assessments.

Capacity 335 MW / 670 MWh
Location Gujarat
Last Date 22/01/2026
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage energy storage policy grid-scale batteries power sector tenders renewable integration Standalone BESS
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

NTPC Renewable Energy Floats EPC Tender for 300 MW Solar Project in Rajasthan

NTPC Renewable Energy Floats EPC Tender for 300 MW Solar Project in Rajasthan

NTPC Green Energy has invited bids for setting up 1,950 MW/7,800 MWh of BESS capacity at NTPC REL's solar project in Bikaner, Rajasthan

NTPC Green Energy Floats 1,950 MW/7,800 MWh BESS Tender for Bikaner Solar Project

NTPC REL Invites Bids for 2,000 MW Pumped Hydro Energy Storage Project

NTPC REL Invites Bids for 2,000 MW Pumped Hydro Energy Storage Project

Comments are closed.

Renewable energy
PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

PIP Partners with Fourier to Deploy Hydrogen-Powered Energy Storage System in Gujarat

June 4, 2026
IIT Guwahati

IIT Guwahati Develops Perovskite Technology Achieving 25.73% Solar Cell Efficiency

June 4, 2026
India’s Clean Energy Sector

India’s Clean Energy Workforce Grows by 6.6 Lakh, Rooftop Solar Leads Job Creation

June 4, 2026
SJVN Flags

SJVN Flags Renewable Power Demand Gap Amid Rising Capacity Additions

June 4, 2026
Batteries
NavPrakriti and IIT Kharagpur

NavPrakriti and IIT Kharagpur Partner to Advance Battery Recycling and Critical Mineral Recovery

June 4, 2026
Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

Advait Energy Secures 150 MW/300 MWh BESS Project from GUVNL

June 4, 2026
cylib and Vianode

cylib and Vianode Partner to Advance Recycled Graphite for EV Batteries

June 4, 2026
Trina Storage

Trina Storage Wins 160 MWh Ultra-High Voltage Battery Project in Japan’s Kyushu Region

June 3, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.