Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » Lineage Power Signs Two MoUs with Onwards Solar and Kalpa Power at 12th IESW 2026 Yashobhoomi, New Delhi
Battery Manufacturing (BESS)

Lineage Power Signs Two MoUs with Onwards Solar and Kalpa Power at 12th IESW 2026 Yashobhoomi, New Delhi

PrakashBy PrakashJuly 10, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Lineage Power Signs Two MoUs with Onwards Solar and Kalpa Power at 12th IESW 2026 Yashobhoomi, New Delhi

Pace Digitek Limited announced that its subsidiary, Lineage Power Private Limited (LPPL), has signed two strategic Memoranda of Understanding (MoU) with Onwards Solar Power Private Limited and Kalpa Power Private Limited during the 12th India Energy Storage Week (IESW) 2026 at IICC, Yashobhoomi, New Delhi, where Pace Digitek Limited and LPPL are showcasing their integrated Battery Energy Storage System (BESS) portfolio and advanced energy storage solutions at Hall 1, Stall 4.

The MoUs establish a framework for collaboration, with LPPL serving as a preferred BESS supply partner and supporting future projects with integrated BESS solutions, including DC Blocks, Power Conversion Systems (PCS), Energy Management Systems (EMS), engineering support, warranty, and lifecycle services.

Definitive agreements and purchase orders will govern project-specific commercial terms and supply arrangements between the respective parties.

The collaborations aim to strengthen the supply of domestically manufactured BESS solutions for utility-scale, commercial & industrial (C&I), and other energy storage applications.

Lineage Power Private Limited’s integrated manufacturing capabilities enable the company to offer comprehensive energy storage solutions across the value chain. These partnerships further strengthen Pace Digitek Limited’s strategy to expand its product-led energy storage business through collaborations with EPC companies, renewable energy developers, and system integrators.

Commenting on the development, Mr. Venugopal Rao Maddisetty, Chairman & Managing Director, Pace Digitek Limited, said: “India’s energy storage market is entering a phase of accelerated growth, creating significant opportunities for technology-led and domestically manufactured solutions. These strategic collaborations reinforce our commitment to expanding our product supply network and strengthening partnerships across the energy storage ecosystem. By combining our integrated manufacturing capabilities with the market reach and execution strengths of our partners, we aim to support the growing deployment of reliable, high-quality BESS across India.”

Pace Digitek Limited is an integrated infrastructure and energy solutions company operating across energy and telecom & ICT business segments. The company operates across the value chain, spanning Manufacturing, Engineering, Procurement & Construction (EPC) and Operations & Maintenance (O&M) activities, supporting both project execution and product supply.

In the energy segment, the company undertakes Battery Energy Storage System (BESS) design, manufacturing, integration and deployment. Through its subsidiary, Lineage Power Private Limited, it also manufactures energy storage systems and related power infrastructure products.

In the telecom segment, the Company undertakes manufacturing of telecom power systems and provides EPC services and O&M for telecom infrastructure, fibre networks and digital infrastructure projects across multiple circles in India

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS EPC India News memorandum of understanding telecom power systems
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Renewable Energy Partnership to help decarbonise Kruger National Park in its Centenary Year

Kruger National Park Secures Renewable Electricity Supply

TERI and TKIL Industries Partner on Hydrogen, Sustainability and Green Technologies

TERI and TKIL Industries Partner on Hydrogen, Sustainability and Green Technologies

Arevon Secures Three 20-Year Renewable Energy Credit Contracts for its 200 Megawatt Panther Energy Project in Illinois

Arevon Signs Three 20-Year REC Agreements for 200 MW Panther Energy Project in Illinois

Leave A Reply Cancel Reply

15 − 14 =

Renewable energy
Renewable Energy Partnership to help decarbonise Kruger National Park in its Centenary Year

Kruger National Park Secures Renewable Electricity Supply

October 14, 2026
TERI and TKIL Industries Partner on Hydrogen, Sustainability and Green Technologies

TERI and TKIL Industries Partner on Hydrogen, Sustainability and Green Technologies

October 14, 2026
Arevon Secures Three 20-Year Renewable Energy Credit Contracts for its 200 Megawatt Panther Energy Project in Illinois

Arevon Signs Three 20-Year REC Agreements for 200 MW Panther Energy Project in Illinois

October 14, 2026
Solidion Technology Focuses on Meeting Rising Energy Storage Demand from AI Data Centers

Solidion Technology Focuses on Meeting Rising Energy Storage Demand from AI Data Centers

October 14, 2026
Batteries
Nightpeak Energy Commissions Bocanova 2, Completing 300 MW Battery Storage Project in ERCOT

Nightpeak Energy Commissions Bocanova 2, Completing 300 MW Battery Storage Project in ERCOT

October 14, 2026
NETRA Survey Projects 50% Reduction in India’s Battery Storage Imports by 2035 Through Alternative Chemistries

NETRA Survey Projects 50% Reduction in India’s Battery Storage Imports by 2035 Through Alternative Chemistries

October 14, 2026
Ampotech, Buskowitz Energy Partner to Integrate Energy Efficiency, Solar and Battery Storage Solutions

Ampotech, Buskowitz Energy Partner to Integrate Energy Efficiency, Solar and Battery Storage Solutions

October 14, 2026
Can Battery Recycling Secure India's Critical Minerals Future

Can India Become Self-Reliant in Critical Minerals Through Battery Recycling? The Road to 2030 and Beyond

October 14, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.