Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Solar » MNRE Issues Standardised Branding Guidelines for PM Surya Ghar Rooftop Solar Installations
Solar

MNRE Issues Standardised Branding Guidelines for PM Surya Ghar Rooftop Solar Installations

Shivangi GuptaBy Shivangi GuptaAugust 4, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
MNRE Issues Standardised Branding Guidelines for PM Surya Ghar Rooftop Solar Installations

The Ministry of New and Renewable Energy (MNRE) has notified a standardised branding framework for rooftop solar systems installed under the PM Surya Ghar: Muft Bijli Yojana (PMSG: MBY), aiming to ensure uniform identification and visibility of projects implemented through the Centre’s flagship residential solar programme.

The new guidelines, issued through an Office Memorandum, apply to rooftop solar installations executed under both the Capital Expenditure (CAPEX) and Utility-Led Aggregation (ULA) models. The ministry said the initiative is intended to establish consistent branding across installations as the government works towards its target of installing rooftop solar systems in one crore households by FY 2026-27.

  • Applies to CAPEX and ULA installations.
  • Covers PV modules, inverters and ACDBs.
  • Mandatory for all PM Surya Ghar vendors.

According to the framework, all empanelled vendors undertaking installations under the scheme must display the PM Surya Ghar logo on key system components, including solar photovoltaic (PV) modules, solar inverters, AC Distribution Boxes (ACDBs), and other equipment. MNRE has also released illustrative diagrams specifying the correct placement of the logo on each component.

  • Logo placement specified for all components.
  • Durable, weather-resistant stickers mandatory.
  • Non-compliance may lead to vendor penalties.

For solar PV modules, vendors are required to affix the logo on the lower right corner of the front aluminium frame. The ministry has specified that at least one logo sticker must be provided for every kilowatt of installed capacity, with a minimum of one sticker on each module. The recommended sticker size is 25 mm × 25 mm, and the branding should not cover manufacturer nameplates, serial numbers, QR codes, warranty details, technical specifications, or safety labels.

For solar inverters and ACDBs, the guidelines prescribe a 50 mm × 50 mm logo sticker to be placed on the lower right corner of the front exterior surface. The ministry has clarified that branding must not obstruct equipment displays, ventilation openings, safety instructions, regulatory markings, or other essential information.

MNRE has further directed that all branding materials should be durable and suitable for outdoor conditions, with properties such as UV resistance, weather resistance, waterproofing, and corrosion resistance to ensure long-term visibility. Vendors will also be responsible for replacing damaged or worn-out stickers during the Comprehensive Maintenance Contract (CMC) period. The ministry has made it clear that no additional Central Financial Assistance (CFA) will be provided for branding, and the associated costs must be borne by vendors.

The guidelines also assign responsibility to the National Programme Implementation Agency (NPIA), State Implementing Agencies (SIAs), and DISCOMs to inspect rooftop solar installations during and after commissioning to verify compliance. These agencies have been authorised to recommend modifications or seek rectification wherever branding does not meet the prescribed standards.

MNRE has warned that vendors failing to comply with the branding requirements may face regulatory action after due notice, including possible de-registration and other penalties under the applicable provisions. The move is expected to improve the visibility and uniform identity of installations under the PM Surya Ghar programme while strengthening quality monitoring and implementation across the country’s rapidly expanding rooftop solar sector.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
India News MNRE PMSGMBY Solar solar energy solar project solar projects
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

TrueRE Oriana Power Plans Five CBG Plants Across Three States

TrueRE Oriana Power Plans Five CBG Plants Across Three States

Bhutan Extends Chhukha Power Export Agreement with India

Bhutan, PTC India Extend Chhukha Hydropower Export Agreement Until 2031

MULTIFIT Strengthens Its Solar and Battery Storage Portfolio

MULTIFIT Expands Solar Storage Portfolio with Hybrid Inverters and Integrated Battery Systems

Leave A Reply Cancel Reply

17 − 12 =

Renewable energy
TrueRE Oriana Power Plans Five CBG Plants Across Three States

TrueRE Oriana Power Plans Five CBG Plants Across Three States

November 20, 2026
Bhutan Extends Chhukha Power Export Agreement with India

Bhutan, PTC India Extend Chhukha Hydropower Export Agreement Until 2031

November 20, 2026
KKR Takes Minority Stake in Gentari’s India Renewables Platform

KKR Takes Minority Stake in Gentari’s India Renewables Platform

November 20, 2026
APTEL Scraps rs 0.50 Rate for Excess Wind Power

APTEL Orders Full Tariff Payment for Wind Power Beyond Normative CUF

November 20, 2026
Batteries
MULTIFIT Strengthens Its Solar and Battery Storage Portfolio

MULTIFIT Expands Solar Storage Portfolio with Hybrid Inverters and Integrated Battery Systems

November 20, 2026
Four Firms Advance Under Rare Earth Magnet Scheme

Coal India, ReNew Among Four Firms Advancing Under ₹7,280-Crore Rare Earth Magnet Scheme

November 20, 2026
Juniper Green Commissions 108.50 MWp Solar, 94.77 MWh BESS

Juniper Green Adds 108.50 MWp Solar and 94.77 MWh Storage to Portfolio

November 20, 2026
Midwest Energy Wins LoI for 1,200 MTPA Magnets

Midwest Energy Secures LoI for 1,200 MTPA Rare Earth Magnet Project Under Centre’s ₹7,280-Crore Scheme

November 20, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.