Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » Northern Solar Holdings Secures 189 MW Solar and BESS Contracts for Malaysian Data Centres
Battery Manufacturing (BESS)

Northern Solar Holdings Secures 189 MW Solar and BESS Contracts for Malaysian Data Centres

Shivangi GuptaBy Shivangi GuptaNovember 6, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Northern Solar Holdings Secures 189 MW Solar and BESS Contracts for Malaysian Data Centres

Malaysia-based renewable energy company Northern Solar Holdings Berhad has secured two contracts totalling 189 MWac of solar capacity integrated with battery energy storage systems (BESS) to supply electricity to two data centres in Malaysia. The contracts were awarded to its wholly owned subsidiary, Northern Solar Assets Sdn. Bhd., under the Corporate Renewable Energy Supply Scheme (CRESS).

The agreements will support renewable energy supply for Malaysia’s expanding data centre sector, which is witnessing increasing electricity demand.

100 MW Solar and BESS Contract for Data Centre

The first contract covers 100 MWac of solar capacity integrated with battery energy storage systems for a data centre developed by a Malaysian property investment and data centre infrastructure company.

The facility has an estimated annual electricity requirement of 262.8 million kWh. The solar and storage project is expected to support renewable energy supply for its electricity consumption.

89 MW Solar and Storage Project

The second agreement covers 89 MWac of solar capacity paired with BESS. The contract was awarded by a Malaysian subsidiary of a Singapore-based data centre operator.

The associated data centre has an annual electricity requirement of 233.89 million kWh, adding to the combined energy demand covered by the two agreements.

Nearly 500 Million kWh Annual Electricity Demand

Together, the two data centres are expected to require nearly 500 million kWh of electricity annually. The contracts will enable Northern Solar Holdings to expand its renewable energy supply portfolio while supporting the growing electricity requirements of Malaysia’s data centre industry.

The project values and commencement dates for both contracts have not been disclosed.

The agreements are being implemented under Malaysia’s Corporate Renewable Energy Supply Scheme, which facilitates renewable electricity supply arrangements for corporate consumers and supports the country’s renewable energy deployment.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage CRESS Malaysia Data Centre Energy global news Northern Solar Holdings Solar Energy Malaysia
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Agastya Energy Appoints Eshant Jindal as Head – Branding & Marketing Communication

Agastya Energy Appoints Eshant Jindal as Head – Branding & Marketing Communication

REMC and ISA Partner to Advance Solar Energy, Battery Storage and Indian Railways’ Net Zero Goals

REMC and ISA Partner to Advance Solar Energy, Battery Storage and Indian Railways’ Net Zero Goals

KPI Green Energy Energises 171.5 MWp of Solar and Hybrid Capacity in Gujarat

KPI Green Energy Energises 171.5 MWp of Solar and Hybrid Capacity in Gujarat

Leave A Reply Cancel Reply

three + 9 =

Renewable energy
Northern Solar Holdings Secures 189 MW Solar and BESS Contracts for Malaysian Data Centres

Northern Solar Holdings Secures 189 MW Solar and BESS Contracts for Malaysian Data Centres

November 6, 2026
Agastya Energy Appoints Eshant Jindal as Head – Branding & Marketing Communication

Agastya Energy Appoints Eshant Jindal as Head – Branding & Marketing Communication

November 6, 2026
REMC and ISA Partner to Advance Solar Energy, Battery Storage and Indian Railways’ Net Zero Goals

REMC and ISA Partner to Advance Solar Energy, Battery Storage and Indian Railways’ Net Zero Goals

November 6, 2026
KPI Green Energy Energises 171.5 MWp of Solar and Hybrid Capacity in Gujarat

KPI Green Energy Energises 171.5 MWp of Solar and Hybrid Capacity in Gujarat

November 6, 2026
Batteries
Pentagreen Capital, Candi Solar Sign $50 Million Financing Partnership for 400 MW Solar and BESS Projects in India

Pentagreen Capital, Candi Solar Sign $50 Million Financing Partnership for 400 MW Solar and BESS Projects in India

November 6, 2026
NPCL Invites Bids for 80 MW/320 MWh Standalone BESS Project in Greater Noida Under 12-Year BOOT Model

NPCL Invites Bids for 80 MW/320 MWh Standalone BESS Project in Greater Noida Under 12-Year BOOT Model

November 5, 2026
TREX Energy Commissions Hyderabad BESS Manufacturing Facility with 12 PPM Assembly Line

TREX Energy Commissions Hyderabad BESS Manufacturing Facility with 12 PPM Assembly Line

November 5, 2026
NTPC Green Energy Plans 10 GW/40 GWh BESS Procurement with 15-Year Maintenance

NTPC Green Energy Plans 10 GW/40 GWh BESS Procurement with 15-Year Maintenance

November 5, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.