Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » NTPC Green Energy Plans 10 GW/40 GWh BESS Procurement with 15-Year Maintenance
Tenders

NTPC Green Energy Plans 10 GW/40 GWh BESS Procurement with 15-Year Maintenance

Shivangi GuptaBy Shivangi GuptaNovember 5, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
NTPC Green Energy Plans 10 GW/40 GWh BESS Procurement with 15-Year Maintenance

NTPC Green Energy Limited (NGEL) has issued a notice for an upcoming Invitation for Bids (IFB) for the supply of battery containers and grid-forming Power Conversion Systems (PCS) for a 10 GW/40 GWh Battery Energy Storage System (BESS) portfolio across various project locations. The procurement will be conducted through International Competitive Bidding (ICB).

The notice, dated November 3, 2026, carries IFB reference number NGEL-CS-5853-004(BESS)-9 and outlines the proposed procurement scope, including battery system supply, commissioning supervision and long-term maintenance services.

Key Highlights of NGEL’s 10 GW/40 GWh BESS Tender

  • Total BESS Capacity: 10 GW/40 GWh

  • Battery Technology: Lithium Iron Phosphate (LFP)

  • Power Conversion System: Grid-forming PCS

  • Project Locations: Various projects across NGEL’s portfolio

  • Maintenance Period: 15 years from commissioning of each project

  • Bidding Method: International Competitive Bidding

  • Tender Status: Upcoming Invitation for Bids

Scope of Work Covers Battery Supply and Commissioning

Under the proposed procurement, NGEL intends to engage eligible bidders for the supply of LFP-based containerised battery systems integrated with grid-forming PCS. The scope also includes supervision of erection, installation and commissioning activities at project sites up to the PCS output terminals.

The key components of the proposed contract include:

  • Battery System Supply: Supply of LFP-based containerised battery systems.

  • Grid-Forming PCS: Supply of grid-forming Power Conversion Systems alongside battery containers.

  • Installation and Commissioning: Supervision of erection, installation and commissioning at project sites up to PCS output terminals.

  • Long-Term Service Agreement (LTSA): Comprehensive service and maintenance for 15 years from the commissioning date of each project.

Bidding Documents to Be Issued on NTPC Tender Portal

NGEL stated that the detailed Invitation for Bids will be issued at a later date through its online tendering platform. Interested bidders have been advised to regularly check the official portal for updates regarding the tender schedule and bidding documents.

  • NTPC Tender Portal: ntpctender.ntpc.co.in

  • ETS Portal: bharat-electronictender.com

  • Bidding Platform: Online bidding

  • Registration Requirement: Interested bidders must register with ISN Electronic Tender Services (ETS), if not already registered.

Foreign bidders are required to possess a Class III Digital Signature issued by an Indian Certifying Authority, as specified in the notice.

The notice does not specify the bid submission deadline, project-wise capacity allocation, estimated procurement value or the final bidding schedule. These details are expected to be available in the detailed Invitation for Bids.

Capacity 10 GW/40 GWh
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
battery energy storage BESS tender Grid-Forming PCS India News LFP batteries NTPC Green Energy
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

NPCL Invites Bids for 80 MW/320 MWh Standalone BESS Project in Greater Noida Under 12-Year BOOT Model

NPCL Invites Bids for 80 MW/320 MWh Standalone BESS Project in Greater Noida Under 12-Year BOOT Model

TREX Energy Commissions Hyderabad BESS Manufacturing Facility with 12 PPM Assembly Line

TREX Energy Commissions Hyderabad BESS Manufacturing Facility with 12 PPM Assembly Line

NHPC Q2 FY27 PAT Rises 65% to ₹1,525 Crore; H1 Profit Jumps 32%

NHPC Q2 FY27 PAT Rises 65% to ₹1,525 Crore; H1 Profit Jumps 32%

Leave A Reply Cancel Reply

1 × two =

Renewable energy
CosPower Engineering H1 FY27 PAT Surges 161.75% to ₹5.91 Crore

CosPower Engineering H1 FY27 PAT Surges 161.75% to ₹5.91 Crore

November 5, 2026
SKF India (Industrial) Q2 FY27 Revenue Rises 28.3% to ₹1,042.86 Crore; PAT Grows 34.5%

SKF India (Industrial) Q2 FY27 Revenue Rises 28.3% to ₹1,042.86 Crore; PAT Grows 34.5%

November 5, 2026
Websol Energy Q2 FY27 Revenue Rises 115% to ₹361 Crore, PAT Increases 73%

Websol Energy Q2 FY27 Revenue Rises 115% to ₹361 Crore, PAT Increases 73%

November 5, 2026
SJVN Reports ₹1,417 Crore Q2 Revenue and ₹737 Crore Standalone Net Profit in FY27

SJVN Reports ₹1,417 Crore Q2 Revenue and ₹737 Crore Standalone Net Profit in FY27

November 5, 2026
Batteries
NPCL Invites Bids for 80 MW/320 MWh Standalone BESS Project in Greater Noida Under 12-Year BOOT Model

NPCL Invites Bids for 80 MW/320 MWh Standalone BESS Project in Greater Noida Under 12-Year BOOT Model

November 5, 2026
TREX Energy Commissions Hyderabad BESS Manufacturing Facility with 12 PPM Assembly Line

TREX Energy Commissions Hyderabad BESS Manufacturing Facility with 12 PPM Assembly Line

November 5, 2026
NTPC Green Energy Plans 10 GW/40 GWh BESS Procurement with 15-Year Maintenance

NTPC Green Energy Plans 10 GW/40 GWh BESS Procurement with 15-Year Maintenance

November 5, 2026
Ampace Showcases Two-Wheeler Lithium Battery Solutions at EICMA Milan

Ampace Showcases Two-Wheeler Lithium Battery Solutions at EICMA Milan

November 5, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.