Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Solar » PM Surya Ghar Portal Introduces Mandatory Consumer Approval for Vendor-Consumer Agreements
Solar

PM Surya Ghar Portal Introduces Mandatory Consumer Approval for Vendor-Consumer Agreements

Shivangi GuptaBy Shivangi GuptaSeptember 26, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
PM Surya Ghar Portal Introduces Mandatory Consumer Approval for Vendor-Consumer Agreements

The PM Surya Ghar: Muft Bijli Yojana (PMSG: MBY) portal has introduced a new consumer approval step for Vendor-Consumer Agreements before rooftop solar installation can proceed. Under the updated process, consumers are required to review and approve the agreement through their portal login.
As part of the revised procedure, vendors uploading agreements through the My Applications module must enter the total cost of the rooftop solar (RTS) installation, including taxes and all applicable charges. The total amount entered by the vendor must correspond with the quotation amount submitted during the Feasibility stage, wherever applicable, including loan applications and installations involving capacities above 10 kW.
After the vendor uploads the agreement, the application status will remain pending and display the message “Agreement sent to Consumer for Confirmation.” The consumer will receive an SMS, email and notification through the portal, allowing them to review the agreement and either approve or reject it.
The Upload Installation option will remain disabled until the consumer provides approval for the agreement. If the consumer rejects the document, the vendor will be able to access the rejection remarks and submit a corrected agreement for review.
Any changes made to an agreement after consumer approval will invalidate the earlier approval. The agreement will then have to go through the consumer verification process again.
The PMSG: MBY team has instructed vendors to ensure that the information provided in the agreement is accurate. This includes the agreement details, component brands and pricing, which are required to match the information available on the portal and the actual rooftop solar installation.
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
India News PM Surya Ghar Yojana Residential Solar Energy rooftop solar Solar Subsidy India Vendor-Consumer Agreement
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

TrueRE Oriana Power Plans Five CBG Plants Across Three States

TrueRE Oriana Power Plans Five CBG Plants Across Three States

Bhutan Extends Chhukha Power Export Agreement with India

Bhutan, PTC India Extend Chhukha Hydropower Export Agreement Until 2031

MULTIFIT Strengthens Its Solar and Battery Storage Portfolio

MULTIFIT Expands Solar Storage Portfolio with Hybrid Inverters and Integrated Battery Systems

Leave A Reply Cancel Reply

2 × 2 =

Renewable energy
TrueRE Oriana Power Plans Five CBG Plants Across Three States

TrueRE Oriana Power Plans Five CBG Plants Across Three States

November 20, 2026
Bhutan Extends Chhukha Power Export Agreement with India

Bhutan, PTC India Extend Chhukha Hydropower Export Agreement Until 2031

November 20, 2026
KKR Takes Minority Stake in Gentari’s India Renewables Platform

KKR Takes Minority Stake in Gentari’s India Renewables Platform

November 20, 2026
APTEL Scraps rs 0.50 Rate for Excess Wind Power

APTEL Orders Full Tariff Payment for Wind Power Beyond Normative CUF

November 20, 2026
Batteries
MULTIFIT Strengthens Its Solar and Battery Storage Portfolio

MULTIFIT Expands Solar Storage Portfolio with Hybrid Inverters and Integrated Battery Systems

November 20, 2026
Four Firms Advance Under Rare Earth Magnet Scheme

Coal India, ReNew Among Four Firms Advancing Under ₹7,280-Crore Rare Earth Magnet Scheme

November 20, 2026
Juniper Green Commissions 108.50 MWp Solar, 94.77 MWh BESS

Juniper Green Adds 108.50 MWp Solar and 94.77 MWh Storage to Portfolio

November 20, 2026
Midwest Energy Wins LoI for 1,200 MTPA Magnets

Midwest Energy Secures LoI for 1,200 MTPA Rare Earth Magnet Project Under Centre’s ₹7,280-Crore Scheme

November 20, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.