Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Renewable energy » Solar » ACME Solar Secures ₹1,571 Crore Funding from IIFCL for 300 MW Rajasthan Project
Solar

ACME Solar Secures ₹1,571 Crore Funding from IIFCL for 300 MW Rajasthan Project

Shivangi GuptaBy Shivangi GuptaAugust 27, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
ACME Solar Secures rs 1,571 Crore Funding from IIFCL

ACME Solar has raised long-term project financing of ₹1,571 crore from India Infrastructure Finance Company Ltd (IIFCL) for the construction and development of its 300 MW assured peak power project in Rajasthan.

The ACME Renewtech Sixth project is funded by IIFCL as the sole lender, and the repayment period of the financing is 19 years. This is the first standalone greenfield financing by IIFCL for ACME Solar, and it enhances the company’s ability to access long-term funds for renewable energy development.

This fresh round of funding has taken the total funding secured by ACME Solar in the current fiscal year to ₹10,976 crore as the company continues to focus on growing its renewable energy and energy storage portfolio.

The project has signed a 25 year Power Purchase Agreement (PPA) with SECI Limited at a tariff of ₹6.28 per unit. Unlike traditional solar projects, under the PPA, the facility will combine solar generation with a Battery Energy Storage System (BESS) to ensure reliable peak power.

The project will involve an outlay of ₹2,123 crore and will have a 1,350 MWh BESS linked to solar generation. The storage system is expected to be a critical enabling component for predictable, dispatchable power supply, allowing the project to more effectively meet its contractual peak power obligations.

This is part of a larger program of ACME Solar to deploy battery-storage capital in the current fiscal year. The project integrates renewable generation with large-scale battery storage to address one of the main challenges of renewable energy – solar power generation variability.

“The Rajasthan project will help ACME Solar consolidate its position in the emerging assured and dispatchable renewable power segment. Adding BESS to solar capacity enables renewable electricity to be delivered at peak demand, bringing reliability and flexibility to clean power.

The financing milestone also points to the growing role of infrastructure lenders in supporting India’s transition to renewable energy and energy storage. Funding long-term projects can help developers undertake capital-intensive projects and support the expansion of the country’s clean-energy infrastructure.

ACME Solar has lined up financing of ₹10,976 crore so far this fiscal to step up investments in renewable energy and battery storage. The 300 MW Rajasthan project, backed by a 25-year PPA and 1,350 MWh of battery storage, is another significant step in the company’s strategy to develop reliable, large scale renewable power projects.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
clean energy India News renewable energy Solar solar energy solar project solar projects
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

Juniper Green Energy Q1 Profit Rises 54 percent

Juniper Green Energy Q1 Profit Rises 54% as Revenue Nears ₹300 Crore

Ukraine Ranks as Europe’s Fourth-Largest Battery Storage Market

Ukraine Ranks as Europe’s Fourth-Largest Battery Storage Market with 3 GWh Installed

MNRE Deactivates 66 Vendors

MNRE Deactivates 66 Vendors Amid Backlog of PM Surya Ghar Applications

Leave A Reply Cancel Reply

12 + fifteen =

Renewable energy
Juniper Green Energy Q1 Profit Rises 54 percent

Juniper Green Energy Q1 Profit Rises 54% as Revenue Nears ₹300 Crore

August 27, 2026
Ukraine Ranks as Europe’s Fourth-Largest Battery Storage Market

Ukraine Ranks as Europe’s Fourth-Largest Battery Storage Market with 3 GWh Installed

August 27, 2026
ACME Solar Secures rs 1,571 Crore Funding from IIFCL

ACME Solar Secures ₹1,571 Crore Funding from IIFCL for 300 MW Rajasthan Project

August 27, 2026
MNRE Deactivates 66 Vendors

MNRE Deactivates 66 Vendors Amid Backlog of PM Surya Ghar Applications

August 27, 2026
Batteries
Sungrow Energy Storage Project

Sungrow Accelerates 200 MW/400 MWh Energy Storage Project Deployment

August 26, 2026
Tamil Nadu to Achieve 50% Renewable Energy

Tamil Nadu to Achieve 50% Renewable Energy Share by 2031

August 26, 2026
GameChange Energy Commissions 23 MWp

GameChange Energy Commissions 23 MWp Dannevirke Solar Farm in New Zealand

August 26, 2026
Roofsol Energy signs PPA with ACG

Roofsol Energy signs PPA with ACG for 5 MWp Solar and 4 MWh BESS project in Maharashtra

August 26, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.