Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » GM and Redwood Materials Partner to Boost U.S. Energy Storage with EV Batteries
Batteries

GM and Redwood Materials Partner to Boost U.S. Energy Storage with EV Batteries

PrakashBy PrakashJuly 17, 20253 Mins Read
Facebook Twitter LinkedIn WhatsApp
General Motors partners with Redwood Materials to accelerate U.S. energy storage using new and second-life EV batteries.

General Motors has signed a non-binding memorandum of understanding with Redwood Materials meant to accelerate deployment of energy storage systems using both new U.S.-manufactured batteries from GM and second-life battery packs from GM electric vehicles.

This collaboration marks a significant step toward taking GM’s advanced battery technology beyond EVs and builds on GM and Redwood’s existing collaboration.

“The market for grid-scale batteries and backup power isn’t just expanding; it’s becoming essential infrastructure. Electricity demand is climbing, and it’s only going to accelerate. To meet that challenge, the U.S. needs energy storage solutions that can be deployed quickly and economically and made right here at home. GM batteries can play an integral role. We’re not just making better cars—we’re shaping the future of energy resilience.”

– Kurt Kelty, VP of batteries, propulsion, and sustainability at GM.

In June, Redwood Materials launched Redwood Energy, a new business that deploys both used EV packs and new modules into fast, low-cost energy-storage systems built to meet surging power demand from AI data centers and other applications. The memorandum announced today enables Redwood to pair that integration expertise with both second-life GM EV packs and new U.S.-built batteries, delivering a domestic solution from cell to system.

Already, GM second-life electric vehicle batteries are being repurposed to help power the largest second-life battery development in the world and the largest microgrid in North America, at Redwood’s 12 MW/63 MWh installation in Sparks, Nevada, supporting the AI infrastructure company Crusoe.

“Electricity demand is accelerating at an unprecedented pace, driven by AI and the rapid electrification of everything from transportation to industry. Both GM’s second-life EV batteries and new batteries can be deployed in Redwood’s energy storage systems, delivering fast, flexible power solutions and strengthening America’s energy and manufacturing independence.”

– JB Straubel, founder and CEO of Redwood Materials.

U.S. electricity demand continues to grow, driven in part by AI data centers that are on track to triple their share of national electricity usage from 4.4% in 2023 to 12% by 2028. As power consumption increases, there’s an expanding need for energy storage systems that can act to offset power outages and reinforce the grid when demand is high or supply is limited.

GM and Redwood Materials expect to announce more details on their plans later in 2025.

Cautionary Note on Forward-Looking Statements: This press release and related comments by management may include “forward-looking statements” within the meaning of the U.S. federal securities laws. Forward-looking statements are any statements other than statements of historical fact and represent our current judgment about possible future events. These statements are not guarantees of any future events or financial results, and our actual results may differ materially due to a variety of factors, many of which are described in our most recent Annual Report on Form 10-K and our other filings with the U.S. Securities and Exchange Commission. We caution readers not to place undue reliance on forward-looking statements. Forward-looking statements speak only as of the date they are made, and we undertake no obligation to update or revise any forward-looking statements, whether as a result of new information, future events, or other factors that affect the subject of these statements, except where we are expressly required to do so by law.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS EV batteries
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Comments are closed.

Renewable energy
Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

Telangana Floats ₹1.60 Lakh Tender for Solar Fencing at Urban Health Centre

July 21, 2026
GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

GERC Grants 30-Day Relief to 11.88 MW Solar Project Despite Rejecting Force Majeure Claim

July 21, 2026
India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

India’s Data Centre Capacity to Surge to 6.5 GW by 2030, Boosting Demand for Energy Storage

July 21, 2026
Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

Indofast Energy, Hala Mobility Target 40,000 EVs With Battery Swapping by March 2027

July 21, 2026
Batteries
Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

Hyundai Expands EV Charging Network, Offers Access to 30,000+ Charging Points Through myHyundai App

July 21, 2026
Smarten Power Systems, an Indian provider of solar energy and power backup solutions for both residential and commercial customers, released its business report for the quarter that concluded on June 30, 2026 (Q1 FY2026–27). Operational advancements in sales, distribution, manufacturing, and infrastructure characterised the quarter.

Smarten Power Systems Released its Business Report Q1 FY27 Sells 1.18 Lakh Units and Adds 32 Distributors in Nine States

July 21, 2026
Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

Fox ESS Launches POWER BEAST C&I Energy Storage System in Australia

July 21, 2026
Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

Adani Electricity Mumbai Gets Approval for 750 MW Round-the-Clock Renewable Power Procurement

July 21, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.