Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Radian Generation Supports Successful Launch of 100 MWac BESS Project in Texas
Batteries

Radian Generation Supports Successful Launch of 100 MWac BESS Project in Texas

PrakashBy PrakashJuly 8, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
Radian Generation Supports Successful Launch of 100 MWac BESS Project in Texas

Radian Generation announces the successful NERC registration and achievement of the Commercial Operations Date (COD) for the Bexar Battery Energy Storage System, developed by Goshe Energy Storage. The 100 MWac facility reached COD on March 12, 2026, with ERCOT III approval. NERC registration was completed on March 20, after a coordinated effort with Radian and implementation of NERC compliance standards.

Located in Bexar County, Texas, the Bexar BESS is designed with a total capacity of 100 MWac, strengthening ERCOT grid reliability amid accelerating renewable energy integration. As a facility exceeding the 75 MVA threshold, Bexar BESS was required to register as a NERC Category 1 Generation Owner (GO). Radian Generation partnered closely with Goshe Energy Storage during the final stages of commissioning to validate engineering controls, confirm technical alignment, establish procedures, and meet NERC CIP cybersecurity obligations, ensuring full regulatory compliance upon registration.

Tyler Bohan, Goshe’s director of engineering, stated, “Bringing a facility of this scale into commercial operation while simultaneously meeting NERC registration requirements is no small task. Radian’s team understood our timeline, worked seamlessly alongside our engineers, and made sure we were compliant and confident from the moment we went live.”

Radian Generation’s engagement efforts increased as the project approached its COD, working with the project owner, EPC, and Generator Operator (GOP) to review technical documentation, operational technology design, and as-built system components. This collaborative NERC readiness process reflects Radian’s approach for utility-scale storage projects, delivering facility-specific compliance support throughout the project lifecycle.

“With COD and NERC registration complete, we look forward to continuing to support the Bexar BESS project through ongoing compliance and cybersecurity services,” concluded Haley Horgan, account executive with Radian Generation.

Goshe Energy Storage, LLC, develops, builds, and operates utility-scale battery energy storage projects designed to enhance grid resiliency and reliability. Founded in 2022, Goshe focuses on enabling a cleaner, more stable energy system through flexible, grid-scale storage solutions that support the integration of wind, solar, and other renewable resources.

Radian Generation was founded in 2013 on the core principle of driving sustainable growth by providing asset management products and solutions to support the complete lifecycle of renewable facilities. The Radian Digital platform provides tools to maximize efficiency, mitigate risks, and boost profitability, providing stakeholders with real time access to the data they need. Radian provides solutions to over 40 GW of solar, wind, and battery storage assets around the world and is dedicated to empowering the transition to a cleaner energy future.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS projects global news Goshe Energy Storage Radian Generation
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

NTPC Green Energy expands its portfolio to 10.72 GW by adding 50.4 MW of wind power in Gujarat

NTPC Green Energy expands its portfolio to 10.72 GW by adding 50.4 MW of wind power in Gujarat

Can India Challenge China in Solar Manufacturing

The Equal Sun, Unequal Race: Can India Challenge China in Solar Manufacturing?

Offgrid Energy Labs Opens UK's  First Foreign ZincGel Battery Plant 

Offgrid Energy Labs Opens UK’s  First Foreign ZincGel Battery Plant 

Leave A Reply Cancel Reply

four + seven =

Renewable energy
NTPC Green Energy expands its portfolio to 10.72 GW by adding 50.4 MW of wind power in Gujarat

NTPC Green Energy expands its portfolio to 10.72 GW by adding 50.4 MW of wind power in Gujarat

July 8, 2026
By September 2026, Premier Energies plans to increase solar cell capacity from 3.6 GW to 10.6 GW.

Premier Energies plans to increase solar cell capacity from 3.6 GW to 10.6 GW, By September 2026

July 7, 2026
Offgrid Energy Labs Opens UK's  First Foreign ZincGel Battery Plant 

Offgrid Energy Labs Opens UK’s  First Foreign ZincGel Battery Plant 

July 7, 2026
MNRE Clarifies Applicability of ALMM List-II for Solar PV Cells on Rooftop Solar Projects on Government Buildings

MNRE Clarifies Applicability of ALMM List-II for Solar PV Cells on Rooftop Solar Projects on Government Buildings

July 7, 2026
Batteries
Radian Generation Supports Successful Launch of 100 MWac BESS Project in Texas

Radian Generation Supports Successful Launch of 100 MWac BESS Project in Texas

July 8, 2026
Sicona Secures Funding to Advance Silicon-Carbon Battery Tech

Himadri-Backed Sicona Accelerates Commercialisation of Silicon-Carbon Battery Materials with AUD 45 Million Funding

July 7, 2026
Gotion High-Tech to Invest €950 Million in Spain for Battery Cathode and Recycling Facilities

Gotion High-Tech to Invest €950 Million in Spain for Battery Cathode and Recycling Facilities

July 6, 2026
Grenergy Signs

Grenergy Signs Largest-Ever 15-Year PPA Backed by Chile Battery Storage Project

July 2, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.