Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » Solar Tender » SECI Floats 4 MW Solar Tender for Elevated Delhi–Dehradun Highway Under RESCO Mode
Solar Tender

SECI Floats 4 MW Solar Tender for Elevated Delhi–Dehradun Highway Under RESCO Mode

Shweta KumariBy Shweta KumariOctober 12, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
SECI Floats 4 MW Solar Tender

The Solar Energy Corporation of India (SECI) has issued a Notice Inviting Tender (NIT) for selecting a solar power developer to set up a minimum 4 MW solar PV project for the National Highways Authority of India (NHAI) under the Renewable Energy Service Company (RESCO) model. The tender, designated as Phase I, aims to develop solar power capacity along the elevated section of the Delhi–Dehradun Highway.

According to SECI’s official announcement dated 10 October 2026, the agency will select a solar power developer through a Request for Selection (RfS) process. The initiative brings highway infrastructure into the scope of renewable energy deployment, with the selected developer expected to undertake the project under the RESCO framework.

Key Tender Details

  • Tendering Agency: Solar Energy Corporation of India (SECI)
  • Project Authority: National Highways Authority of India (NHAI)
  • Project: Solar PV power project on the elevated Delhi–Dehradun Highway
  • Minimum Capacity: 4 MW
  • Phase: Phase I
  • Implementation Model: Renewable Energy Service Company (RESCO)
  • Selection Process: Request for Selection (RfS)
  • Tender Notice Date: 10 October 2026
  • Project Location: Elevated section of the Delhi–Dehradun Highway

RESCO Model to Drive Solar Deployment

Under the RESCO model, a renewable energy service provider typically develops and operates a solar installation and supplies the generated electricity under an agreed commercial arrangement. This structure can enable project owners or electricity consumers to access solar power without necessarily making the entire upfront investment themselves. The precise commercial terms for this project will be governed by the detailed bidding documents.

The proposed installation is part of efforts to explore renewable energy generation opportunities associated with highway infrastructure. Elevated road sections and other transport facilities may offer opportunities for solar deployment, subject to technical feasibility, structural considerations, land or space availability, safety requirements and grid connectivity.

Detailed Bidding Documents Awaited

SECI’s notice invites the selection of a solar power developer for the project. The detailed Request for Selection documents are to be accessed through SECI’s website, the Indian e-Procurement System (ISN-ETS) and the Central Public Procurement Portal (CPPP).

The NIT announcement does not establish a project award or confirm that construction has begun. Further details, including the bidding schedule, eligibility conditions, tariff requirements, project execution obligations and commissioning timeline, should be verified against the complete RfS document and any subsequent corrigenda.

The tender marks an initial step towards developing solar generation capacity along the elevated highway corridor. Its implementation will depend on the detailed tender conditions, bidder selection and subsequent project execution.

Capacity 4 MW
Location Elevated section of the Delhi–Dehradun Highway
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Delhi–Dehradun Highway India News NHAI RESCO Model SECI Tender Solar Tender
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

PM Modi Launches 500 MWh BESS

PM Modi Lays Foundation for 500 MWh BESS, ₹17,000 Crore VOC Port Green Hub Planned in Tamil Nadu

Trontek Targets 12 GWh Annual BESS Manufacturing Capacity by 2028

Trontek Targets 12 GWh Annual BESS Manufacturing Capacity by 2028

India Turns to 25 GW of Old Wind Farms to Reach 100 GW Goal

India Turns to 25 GW of Old Wind Farms to Reach 100 GW Goal

Leave A Reply Cancel Reply

3 × two =

Renewable energy
India Turns to 25 GW of Old Wind Farms to Reach 100 GW Goal

India Turns to 25 GW of Old Wind Farms to Reach 100 GW Goal

October 12, 2026
U-Solar Targets 200 MW in New Renewable Assets

U-Solar Targets 200 MW in New Renewable Assets, Turnover to Cross ₹1,000 Crore

October 12, 2026
Prozeal has signed a Framework Agreement with a European IPP

Prozeal Green Energy Signs Framework Agreement for 100 MW Gujarat Solar Project Worth ₹460 Crore

October 12, 2026
KP Group Appoints Devanand Garud as Chief Procurement Officer

KP Group Appoints Devanand Garud as Chief Procurement Officer

October 12, 2026
Batteries
PM Modi Launches 500 MWh BESS

PM Modi Lays Foundation for 500 MWh BESS, ₹17,000 Crore VOC Port Green Hub Planned in Tamil Nadu

October 12, 2026
Trontek Targets 12 GWh Annual BESS Manufacturing Capacity by 2028

Trontek Targets 12 GWh Annual BESS Manufacturing Capacity by 2028

October 12, 2026
Fibocom Showcases IoT Solutions for Smart Energy and EV Battery Tracking at IMC 2026

Fibocom Showcases IoT Solutions for Smart Energy and EV Battery Tracking at IMC 2026

October 9, 2026
Birla Carbon Expands Conductive Carbon Solutions for Advanced Battery Applications

Birla Carbon Expands Conductive Carbon Solutions for Advanced Battery Applications

October 9, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.