Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Batteries » Battery Manufacturing (BESS) » Trina Storage to Supply BESS for Western Australia Renewable Energy Project
Battery Manufacturing (BESS)

Trina Storage to Supply BESS for Western Australia Renewable Energy Project

Shivangi GuptaBy Shivangi GuptaSeptember 17, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
Trina Storage to Supply BESS for Western Australia Renewable Energy Project

Trina Storage, the utility-scale energy storage division of Trinasolar, has been selected to supply a battery energy storage system (BESS) for Stage One of Frontier Energy’s Waroona Renewable Energy Project in Western Australia.

Located 120 kilometres south of Perth, Waroona Stage One comprises a 132MW solar facility paired with an 81.5MW / 6.9-hour BESS and is one of the largest solar and battery hybrid projects on Western Australia’s main electricity grid. First generation is scheduled from 2028.

Trina Storage will supply its Elementa utility-scale DC solution, comprising lithium iron phosphate (LFP) cells produced at Trina’s Changzhou battery plant. Trina’s Elementa range of products incorporate intelligent liquid cooling and multiple layers of safety protection, including heat, gas and smoke detection and active fire protection systems.

Trina Storage draws on Trina Group’s expertise across high-power PV modules and tracker systems, supporting a deeper understanding of solar plant design and system interfaces. The project will use a DC-coupled architecture, adding complexity to the design of the solar and storage system.

Warrick Stapleton, Head of Sales (APAC) for Trina Storage, said close collaboration was increasingly important as utility-scale storage projects became more sophisticated.

“We’re pleased that Frontier Energy selected Trina Storage for this project. Our team worked closely with Frontier throughout the procurement process to understand the project requirements and demonstrate how our technology could support their objectives,” said Mr. Stapleton.

“As Western Australia continues its energy transition, projects such as Waroona will play an increasingly important role in providing reliable, dispatchable capacity to the South West Interconnected System. We look forward to supporting Frontier through delivery and long-term operation of the asset.”

Trina Storage’s agreement for Stage One includes a 20-year warranty and performance guarantees, underpinning long-term asset performance and supporting the project’s financing requirements.

“Western Australia is undergoing an energy transition, and Waroona Energy Park has the potential to support it through our integrated solar and battery strategy,” said Adam Kiley, Chief Executive Officer of Frontier Energy. “Stage One is the foundation of our broader plans and is designed to support a more reliable and flexible electricity system.”

Stage One forms part of Frontier Energy’s longer-term plans for Waroona, with future stages expected to reach around 1,000MW of generation capacity and up to 660MW of battery capacity.

whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
Battery Energy Storage System BESS energy storage global news Trina Storage Waroona Renewable Energy Project
Shivangi Gupta
  • Website

Shivangi Gupta is a journalist passionate about writing and delivering accurate, clear, and informative news stories across a wide range of topics.

Keep Reading

NPCL Invites Bids for 80 MW/320 MWh Standalone BESS Project in Greater Noida Under 12-Year BOOT Model

NPCL Invites Bids for 80 MW/320 MWh Standalone BESS Project in Greater Noida Under 12-Year BOOT Model

TREX Energy Commissions Hyderabad BESS Manufacturing Facility with 12 PPM Assembly Line

TREX Energy Commissions Hyderabad BESS Manufacturing Facility with 12 PPM Assembly Line

NHPC Q2 FY27 PAT Rises 65% to ₹1,525 Crore; H1 Profit Jumps 32%

NHPC Q2 FY27 PAT Rises 65% to ₹1,525 Crore; H1 Profit Jumps 32%

Leave A Reply Cancel Reply

nine + 3 =

Renewable energy
CosPower Engineering H1 FY27 PAT Surges 161.75% to ₹5.91 Crore

CosPower Engineering H1 FY27 PAT Surges 161.75% to ₹5.91 Crore

November 5, 2026
SKF India (Industrial) Q2 FY27 Revenue Rises 28.3% to ₹1,042.86 Crore; PAT Grows 34.5%

SKF India (Industrial) Q2 FY27 Revenue Rises 28.3% to ₹1,042.86 Crore; PAT Grows 34.5%

November 5, 2026
Websol Energy Q2 FY27 Revenue Rises 115% to ₹361 Crore, PAT Increases 73%

Websol Energy Q2 FY27 Revenue Rises 115% to ₹361 Crore, PAT Increases 73%

November 5, 2026
SJVN Reports ₹1,417 Crore Q2 Revenue and ₹737 Crore Standalone Net Profit in FY27

SJVN Reports ₹1,417 Crore Q2 Revenue and ₹737 Crore Standalone Net Profit in FY27

November 5, 2026
Batteries
NPCL Invites Bids for 80 MW/320 MWh Standalone BESS Project in Greater Noida Under 12-Year BOOT Model

NPCL Invites Bids for 80 MW/320 MWh Standalone BESS Project in Greater Noida Under 12-Year BOOT Model

November 5, 2026
TREX Energy Commissions Hyderabad BESS Manufacturing Facility with 12 PPM Assembly Line

TREX Energy Commissions Hyderabad BESS Manufacturing Facility with 12 PPM Assembly Line

November 5, 2026
NTPC Green Energy Plans 10 GW/40 GWh BESS Procurement with 15-Year Maintenance

NTPC Green Energy Plans 10 GW/40 GWh BESS Procurement with 15-Year Maintenance

November 5, 2026
Ampace Showcases Two-Wheeler Lithium Battery Solutions at EICMA Milan

Ampace Showcases Two-Wheeler Lithium Battery Solutions at EICMA Milan

November 5, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.