Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » Solar Tender » Haryana Invites Bids for 350 Off-Grid Solar Projects with BESS, 7-Year O&M Clause
Solar Tender

Haryana Invites Bids for 350 Off-Grid Solar Projects with BESS, 7-Year O&M Clause

Shweta KumariBy Shweta KumariMay 5, 20263 Mins Read
Facebook Twitter LinkedIn WhatsApp
Haryana Invites Bids for 350 Off-Grid Solar Power Projects

The Haryana Government has invited bids for the supply, installation and commissioning of 350 off-grid solar power projects with BESS, as part of its ongoing efforts towards decentralised renewable energy deployment across Haryana. The Off-Grid Solar Power Tender ia issued by the Haryana Renewable Energy Development Agency (HAREDA) and it will cover installations across Haryana and Chandigarh.

Capacity Details for The Project

As per the Tender Document, the Project Details are as follows:

  • The installation of 350 off-grid solar PV systems
  • The system caapcity should range between 1 KW to 3KW
  • Total Combined capacity should be around 600 KWp of total combined capacity (Expandable upto 1.5 times)
  • To Deploy in distinct areas across Haryana and Chandigarh

The tender also includes complete electrical wiring up to user points, system testing and commissioning, along with basic training for end users.

Execution Model and Timeline

The project will be implemented under an annual rate contract model, where selected bidders will handle the entire lifecycle of the project.

  • Commissioning timeline: 3 months from work order
  • Responsibility includes design, supply, installation and commissioning
  • Developers must ensure timely execution and performance

O&M and Service Requirements

The Tender document also states the long-term maintenance responsibility on developers:

  • Warranty and Maintenance should be of Comprehensive 7 years
  • Penalties will be applicable if Project will be delayed
  • Any Complaints must be taken care within 72 hours
  • Eligible for blacklisting in case of repeated non-compliance

Technical Specifications

The tender places strong emphasis on quality and system performance. Key requirements include:

  • LiFePO4 (Lithium Iron Phosphate) batteries
  • Hybrid inverters with solar, battery and grid compatibility
  • Advanced battery management systems (BMS)
  • Mandatory use of domestically manufactured solar modules (ALMM compliant)

Eligibility Criteria for the Bidders

To participate in the tender, bidders must meet the following Criteria:

  • Ssolar installation experience of Minimum 250 kW
  • Average annual turnover of ₹2.25 crore (last three years)
  • Must be a manufacturer or system integrator with valid certifications
  • Required component tie-ups (modules, inverter, battery)

Payment Structure

The payment will be released in stages:

  • 50% on supply of materials
  • 40% after installation and commissioning
  • 10% after completion of 7 years or against bank guarantee

Push for Decentralised Solar

This Off-grid Solar Power Projects Tender from Haryana highlights continued focus on off-grid and decentralised solar systems, especially in areas with limited grid reliability. By integrating battery backup and enforcing long-term maintenance, the state aims to ensure reliable and sustainable power access while supporting domestic manufacturing.

Capacity 350 off-grid solar PV systems
Location Haryana and Chandigarh
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BMS India News
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

Ola S1Z Brings Bharat Cell LFP Battery

Ola S1Z Brings Bharat Cell LFP Battery Technology to Mass Market

Government, Industry Leaders from 40 Nations to Gather at Bharat Electricity,

Government, Industry Leaders from 40 Nations to Gather at Bharat Electricity, POWERGEN India & Indian Utility Week 2026

GK Energy Wins rs454.5 Crore Rooftop Solar Order

GK Energy Wins ₹454.5 Crore Rooftop Solar Order Covering 100 MW Capacity

Leave A Reply Cancel Reply

four × 1 =

Renewable energy
Ola S1Z Brings Bharat Cell LFP Battery

Ola S1Z Brings Bharat Cell LFP Battery Technology to Mass Market

August 31, 2026
Government, Industry Leaders from 40 Nations to Gather at Bharat Electricity,

Government, Industry Leaders from 40 Nations to Gather at Bharat Electricity, POWERGEN India & Indian Utility Week 2026

August 31, 2026
GK Energy Wins rs454.5 Crore Rooftop Solar Order

GK Energy Wins ₹454.5 Crore Rooftop Solar Order Covering 100 MW Capacity

August 31, 2026
KP Green Engineering Secures rs258 Crore

KP Green Engineering Secures ₹258 Crore Orders as KPI Green Energy Accelerates Solar, Wind and BESS Expansion

August 31, 2026
Batteries
SECI Floats Tender for 50 MW/100 MWh Standalone BESS

SECI Floats Tender for 50 MW/100 MWh Standalone BESS on Short-Term Basis

August 31, 2026
CATL Unveils Local Partnership

CATL Unveils Local Partnership and Full-Chain Energy Storage Solutions in South America

August 29, 2026
NTPC Targets 244 GW Capacity by 2037

NTPC Targets 244 GW Capacity by 2037 with ₹16.86 Trillion Investment Plan

August 29, 2026
Juniper Green Power signs 25-year PPA

Juniper Green Power signs 25-year PPA for 50 MW FDRE Project with BESS

August 29, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.