Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » WBSEDCL Floats Tender for 50 MW Solar Project with 40 MWh Battery Storage
Tenders

WBSEDCL Floats Tender for 50 MW Solar Project with 40 MWh Battery Storage

Shweta KumariBy Shweta KumariOctober 13, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
WBSEDCL Floats Tender for 50 MW Solar Project

West Bengal State Electricity Distribution Company Limited (WBSEDCL) has invited bids for the development of a 50 MW solar photovoltaic (PV) project integrated with a 10 MW/40 MWh battery energy storage system (BESS) at Jungle Sundari Karmanagari II in Purulia district, West Bengal.

The selected developer will also be responsible for the operation and maintenance (O&M) of the entire facility for 12 years from the date of commissioning.

Tender Details

Particular Details
Tendering authority WBSEDCL
Project location Jungle Sundari Karmanagari II, Raghunathpur Block-II, Purulia, West Bengal
Solar capacity 50 MW (AC)
BESS capacity 10 MW/40 MWh
Storage duration 4 hours
NIT reference WBSEDCL/SPGD/Jungle Sundari Karmanagari-II/Solar PV and BESS Project/2026-27/NIT-89
Tender ID 2026_WBSED_1046034_1
Tender publication date 12 October 2026
Earnest Money Deposit (EMD) ₹5 crore
Tender fee Nil
Bid validity 180 days from the date of opening of the technical bid
Project completion period 550 days
O&M period 12 years from commissioning

Scope of Work

The scope includes design and engineering, procurement and supply of equipment, construction and installation of the 50 MW (AC) solar PV plant, and development of the integrated 10 MW/40 MWh BESS. The successful bidder will also undertake testing, commissioning, associated civil and electrical works, grid connectivity and applicable warranty obligations.

The four-hour battery system will be capable of storing and delivering energy over a defined period, helping improve the flexibility of the solar project. Integrating storage with renewable generation can support the management of variations in solar output and make electricity available when generation and demand do not coincide.

Bidding Schedule

According to the tender schedule, the notice was published on 12 October 2026, with document downloads starting the same day. The pre-bid query submission deadline is 28 October 2026 at 12:00 PM, followed by a pre-bid meeting at 2:00 PM.

Bid submission begins on 30 October 2026 at 4:00 PM. The final bid submission deadline is 17 November 2026 at 4:00 PM, while the technical bids are scheduled to open on 19 November 2026 at 1:00 PM.

Supporting Renewable Energy Integration

The project combines utility-scale solar generation with battery storage at a single location in Purulia. Such installations can help distribution utilities manage renewable electricity more flexibly and support the integration of clean energy into the power system.

WBSEDCL has specified a 550-day project completion period and a 12-year O&M obligation, placing responsibility on the selected developer for both project delivery and long-term operation.

Capacity Solar capacity: 50 MW (AC), BESS capacity: 10 MW/40 MWh
Location Jungle Sundari Karmanagari II in Purulia district, West Bengal
Last Date 28/10/2026
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS India News operations and maintenance solar photovoltaic project WBSEDCL West Bengal Tender
Shweta Kumari
  • Website
  • LinkedIn

Sub-editor by profession. Love for words and storytelling, where every word narrates a story. Shaping stories in a world powered by electrons—where lithium meets logic, and every spark tells a tale of innovation, sustainability, and our electrified future.

Keep Reading

VSL PowerHive Plans 7.5 GWh BESS Assembly Plant in Tamil Nadu

VSL PowerHive Plans 7.5 GWh BESS Assembly Plant in Tamil Nadu

Tata Power, Imperial College Join Hands for Energy Storage

Tata Power, Imperial College London Join Hands to Advance Energy Storage and Smart Grid Technologies

MeECL and TERI Sign MoU to Advance Renewable Energy and Storage in Meghalaya

MeECL and TERI Sign MoU to Advance Renewable Energy and Storage in Meghalaya

Leave A Reply Cancel Reply

thirteen + eleven =

Renewable energy
Tata Power, Imperial College Join Hands for Energy Storage

Tata Power, Imperial College London Join Hands to Advance Energy Storage and Smart Grid Technologies

October 13, 2026
MeECL and TERI Sign MoU to Advance Renewable Energy and Storage in Meghalaya

MeECL and TERI Sign MoU to Advance Renewable Energy and Storage in Meghalaya

October 13, 2026
Sunsure Energy Signs 30 MWp Solar PPA with Evonith Steel

Sunsure Energy Signs 30 MWp Solar PPA with Evonith Steel to Cut Industrial Emissions

October 13, 2026
GREW Solar Invites Industry to #BrewWithGrew at REI Expo

GREW Solar Invites Industry to #BrewWithGrew at REI Expo and BRE Summit 2026

October 13, 2026
Batteries
VSL PowerHive Plans 7.5 GWh BESS Assembly Plant in Tamil Nadu

VSL PowerHive Plans 7.5 GWh BESS Assembly Plant in Tamil Nadu

October 13, 2026
NEU Battery Materials Raises US 7.6 Million Dollar

NEU Battery Materials Raises US$7.6 Million to Scale LFP Battery Recycling

October 13, 2026
Trinasolar Unveils 760W TOPCon Solar Modules

Trinasolar Introduces 760W TOPCon Solar Modules and 6.25 MWh BESS in Vietnam

October 13, 2026
Tata Power Renewable Energy Limited

Tata Power Renewables Records Over 130% YoY Growth, Executes 419 MW in Q2 FY27

October 13, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.