Close Menu
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
Facebook LinkedIn WhatsApp
The Battery MagazineThe Battery Magazine
  • Just In
  • Batteries
    • Battery Manufacturing (BESS)
    • Battery Materials & Chemistries
    • Battery Recycling
    • C&I Storage
  • Solar
  • Renewable energy
    • Wind Energy
    • Hydropower
    • Green Hydrogen
    • Bioenergy
  • Tenders
    • Energy Storage
    • Solar Energy
    • Wind Energy
  • Policy
    • Storage
    • Solar
    • Wind
    • EV
    • Transmission
  • EV
    • EV Batteries
    • EV Charging Infrastructure
    • Electric Mobility Trends
  • Grid
    • Transmission & Distribution
    • Grid Infrastructure
    • Power Generation
    • Power Equipments
  • Exclusive
    • Cover Story
    • Watt Matters
    • Perspective
    • Articles
  • More
    • E-Mag
    • Events
    • Contact Us
LinkedIn Facebook WhatsApp YouTube
The Battery MagazineThe Battery Magazine
Home » Tenders » Energy Storage Tender » SJVN Invites Bids for 265 MW/530 MWh Standalone Battery Energy Storage Systems in Haryana
Energy Storage Tender

SJVN Invites Bids for 265 MW/530 MWh Standalone Battery Energy Storage Systems in Haryana

PrakashBy PrakashJuly 27, 20262 Mins Read
Facebook Twitter LinkedIn WhatsApp
NTPC Green Energy Secures 200 MW/800 MWh BESS Capacity in West Bengal

SJVN has invited bids to select Battery Energy Storage System (BESS) developers to establish 265 MW/530 MWh standalone Battery Energy Storage Systems (BESS) in Haryana under the Viability Gap Funding (VGF) scheme through tariff-based competitive bidding. The Request for Selection (RfS) has been issued under RfS No. SJVN/CC Delhi/REIA/2026/BESS-2, with Tender Search Code (TSC) SJVN-2026-TN000001.

The tender aims to select eligible BESS developers for standalone projects that enhance grid stability, integrate renewable energy, and strengthen Haryana’s power infrastructure. The projects shall be implemented under the Viability Gap Funding (VGF) Scheme, which aims to promote investment in the energy storage infrastructure through financial support and thus enable competitive tariff discovery.

As per the tender notification, the Notice Inviting Tender (NIT) has been floated on 24 July 2026, and the last date of submission of bids is 21 August 2026. The tender is being managed from Delhi, and interested developers need to submit their bids within the stipulated time as per the terms and conditions mentioned in the RfS document.

This tender is for the development of a total battery energy storage capacity of 265 MW/530 MWh in Haryana, another major milestone in expanding India’s energy storage ecosystem. Deployment of standalone BESS projects under the initiative is expected to improve the grid’s flexibility, improve the reliability of renewable power integration, and support the country’s broader clean energy transition.

Capacity 265 MW/530 MWh Standalone BESS
Location Haryana
Last Date 21/08/2026
whatsapp icon Electrify your feed! Click here to join our Whatsapp group and to get the latest updates, expert insights, and innovations driving India’s energy storage revolution.
BESS clean energy renewable energy SJVN Limited VGF scheme
Prakash
  • Website
  • LinkedIn

Journalist with experience in researching, reporting, and creating engaging content across diverse topics and platforms. My work has strengthened my skills in communication, relationship building, and understanding people, while also honing my organisational and problem-solving abilities.

Keep Reading

Grasim, Suzlon Partner to Develop India's Wind Turbines with Recyclable Blades

Grasim, Suzlon Partner to Develop India’s Wind Turbines with Recyclable Blades

Sungrow Commissions 1,243 MWh Hams Hall BESS in UK Within 20 Days

Sungrow Commissions 1,243 MWh Hams Hall BESS in UK Within 20 Days

CERC Grants 100% ISTS Waiver to Tata Power’s 198 MW Tamil Nadu Wind Project

CERC Grants 100% ISTS Waiver to Tata Power’s 198 MW Tamil Nadu Wind Project

Leave A Reply Cancel Reply

1 × two =

Renewable energy
Grasim, Suzlon Partner to Develop India's Wind Turbines with Recyclable Blades

Grasim, Suzlon Partner to Develop India’s Wind Turbines with Recyclable Blades

November 4, 2026
CERC Grants 100% ISTS Waiver to Tata Power’s 198 MW Tamil Nadu Wind Project

CERC Grants 100% ISTS Waiver to Tata Power’s 198 MW Tamil Nadu Wind Project

November 4, 2026
CleanMax Reports 56% H1 EBITDA Growth to ₹1,047 Crore, Maintains 1.5 GW FY27 Commissioning Target

CleanMax Reports 56% H1 EBITDA Growth to ₹1,047 Crore, Maintains 1.5 GW FY27 Commissioning Target

November 4, 2026
Odisha Attracts ₹1.17 Lakh Crore Investment Proposals for 11,742 MW Clean Energy Capacity at BRES 2026

Odisha Attracts ₹1.17 Lakh Crore Investment Proposals for 11,742 MW Clean Energy Capacity at BRES 2026

November 4, 2026
Batteries
Sungrow Commissions 1,243 MWh Hams Hall BESS in UK Within 20 Days

Sungrow Commissions 1,243 MWh Hams Hall BESS in UK Within 20 Days

November 4, 2026
Luminous Launches PIXEL Compact Inverter with 40% Smaller Design, 20% Faster Charging and Lithium-Ion Compatibility

Luminous Launches PIXEL Compact Inverter with 40% Smaller Design, 20% Faster Charging and Lithium-Ion Compatibility

November 4, 2026
Risen Energy Maintains BloombergNEF Tier 1 Energy Storage Status Throughout 2026

Risen Energy Maintains BloombergNEF Tier 1 Energy Storage Status Throughout 2026

November 4, 2026
LONGi Secures 10th Consecutive BNEF Tier 1 Energy Storage Listing Amid Stricter Financing Criteria

LONGi Secures 10th Consecutive BNEF Tier 1 Energy Storage Listing Amid Stricter Financing Criteria

November 4, 2026

Subscribe for Updates

Get the latest news about energy storage in your inbox.

    © 2026 Thebatterymagazine.com.
    • Home
    • About Us
    • Contact Us
    • Privacy Policy
    • Terms of Service

    Type above and press Enter to search. Press Esc to cancel.